Five cars deliver 300 tons of material in 6 days. How many tons of material will 10 cars deliver in 9 days?
Correct answer:

Tips for related online calculators
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe
- Transported 23301
The material, which weighed 18.2 tons, was transported by three cars. The second drove 20% more than the first, and the third 20% more than the second. How many tons did one car transport?
- Identical 44271
Ten identical trucks will take 240 tons of concrete to build the dam in 3 working days. How many tons of concrete will seven trucks take to make the dam in 5 days?
- Construction 2449
The construction material was taken away by three different large cars. The weight of the load on the second was 20% more than on the first. The weight on the third was 20% more than on the second. They loaded a total of 18.2 tons. How many tons were on e
- Construction 71794
Two different trucks together would bring the construction material in 6 hours. However, after 4 hours, the first car was transferred to another job, and the second one was driven for another 6 hours. How many hours would it take for the first car to deli
- Accepted 3423
The material for 83 masons of the company is enough for 12 days. How many days will this supply be enough for them if the company has accepted six more masons?