Direct relationship + work - practice problems - page 3 of 6
Number of problems found: 115
- Cardholders 21563
Two cardholders will build a tower of cards in 0.5 hours. In how many hours will five such a tower be built? - Powerful 20773
The 300 liters per minute water starts to flow into the empty pool. We will fill the pool in 5 hours. How long would it take to fill a pool with a more powerful 750L pump per minute? - The orchard
Four temporary workers harvested the orchard in 9 days. How many temporary workers do we need for six days? - Adjustment 20163
Two students adjust the flower bed in 3 hours. How long will this adjustment take for the pupils if they invite four helpers?
- Inspectors 19633
Five inspectors will catch an average of 70 black passengers in 6 days. How many black passengers are caught by nine inspectors in 10 days? - A lot of hay
Martin's grandfather weighed a lot of hay and calculated that for 15 rabbits, it last 100 days. How many days will this lot be enough for 25 rabbits? - Bricklayers 18773
According to the standard, we calculated that two masons would plaster the corridor of the new school building in 54 hours. How long would it take for nine bricklayers to plaster this corridor? - Fifteen 18403
Fifteen ants bring 10 g of food to the anthill in 1 hour. In how many hours will five ants carry 1 kg of food? - Produced 18213
In the factory, they produced 1,500 products a week on five machines. How many machines do they need to produce 2,000 products a week?
- Together 17881
There are six room beds with 200 beds in 2 hours. One room will make 50 beds alone. Then they all continue together. How long will it take to make the rest of the bed together? - Flowerbed 17183
Six pupils will adjust the flower beds on the school grounds in 2 hours. In how many hours will four pupils change the same flowerbed? - Strawberries 16473
On the farm, twelve part-timers planned to harvest a crop of strawberries in 5 days. On the fifth day in the weather forecast, they reported rain. How many part-timers will they need to harvest the strawberries in four days? - Worker's performance
Fifteen workers paint 180 m fence in 3 days. In how many days will nine workers paint a 360 m fence? We assume that each worker has the same, constant and unchangeable performance. - Hectoliters 16023
100hl of water flows out of the tank through three pipes in 8 hours. How many hectoliters of water flow through four pipes in 10 hours?
- Filling 15983
Five 1800hl filling pumps in 3 hours for how long does a 4hl filling 1800hl tank? - Dependence 15181
The pool has 12 flow holes, and 3 of them are open. It fills up in 24 hours. Express the dependence of the time for the pool to fill on the number of open flow holes and construct a graph. - Harvesters 14703
Five combine harvesters shit in 12 days. How long does a 2-fold larger field of combine harvesters take? - Temporary workers
Three temporary workers work in the warehouse and unload the goods in 9 hours. At what time would five temporary workers unload the same products? - In the bakery
24 pieces of bread are baked in the bakery in 2.25 hours. How many breads are baked in the bakery in 6 hours and 45 minutes?
Do you have homework that you need help solving? Ask a question, and we will try to solve it.