Grade - math word problems - page 827 of 947
Number of problems found: 18922
- Plastered 2529
The mason was to plaster 24.2 m² of the wall in 12 shifts. At what percentage did he meet the plan when plastering 306 m² of walls? - Bookbindings 2528
The bookstore processed 2,905 bookbindings, thus exceeding the set plan by 4.12%. How many should it process according to the plan? - Contaminated 2527
The cooperative handed over a total of 4,650 tonnes of contaminated sugar beet. At the time of purchase, they deducted 4.7% of the total weight for impurities. Pure sugar beet contained 19.3% sugar, which recovered 90%. How much sugar was made from the tr - Machines 2
Two machines produce 2,000 products in 50 hours. How many machines do you need to buy to make 15,000 products in 30 hours? - Straightforward 2525
The student has written such a straightforward task in the book: Hanka by three more Emka 2x more Johanna? total 51 Can you help him calculate this fine example? - Workers 2
The worker dug the trench for 7 hours, and another worker for 10 hours. They recruited to work even one worker. Digging should be done for 2 hours. For how long would dig the third worker alone? - Ratio
The radii of the two cones are in the ratio of 5:7. Calculate the volume ratio of cones that have the same height. - Cube - wall
In the cube ABCDEFGH, |CF|=4 √ 2. What is the surface area of the cube? - Trapezoid 2520
Trapezoid with sides a = 10, b = 20, c = 25, d = 15. Calculate all internal angles. - AS - sequence
What are the first ten members of the sequence if a11=22, d=2? - Lcd3
What is LCD of the equation of x/2 + 1/3=5/2? And what is x? - Two looms
On two looms of different performances, the desired amount of fabric can be woven in 6 hours when both are working simultaneously. On the first machine, this amount of fabric would be woven in 10 hours. How long would it take to weave on the second machin - Two trains
Two trains go at each other. First at a speed of 40 km/h and the second at a speed of 60 km/h. At what distance will it be 30 minutes before they will meet? - Brigade - railing
Jonza and Ondřej had the task of painting 1,000 pieces of processed wooden railing parts on a joint brigade. On the first day, Honza painted 153/1,000, Ondřej 14/100. Which of the boys worked faster? How many pieces still need to be painted? Estimate how - Consecutive numbers
The sum of ten consecutive numbers is 105. Determine these numbers (write first and last). - Previous 2513
There are candies on ten benches. There are three candies on the first bench. There are two more candies in each one than in the previous one. Find how many candies there are. - The city 3
The city has 22,000 residents. How long is it expected to have 25,000 residents if the average annual population growth is 1.4%? - Perpendicular diameters
Draw a circle k/S; 4.5 cm/. Next, draw: a/two mutually perpendicular diameters AB and CD b/two radii SA and SE which form an angle of 75 degrees c/chord/KL/= 4 cm d/chord/MN/, which is perpendicular to KL - Determine 2510
Anna, Peter, Rado, Mišo, and Tomáš shared the amount of 250 euros in the ratio 1:1:1:1:1. Find how much each of them received. - Weights
Marry and John together, weighing 49 kg. Their weights are in a ratio of 1:6. Determine their weights.
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.
