Simple proportion + time - math problems
Number of problems found: 45
- Five mechanics
Five mechanics will make a car for some time. How many cars can 30 mechanics produce at the same time?
- Working time
At 10 hours work shift, work is done in 16 days. How many days will the work be done at 8 hours shifts?
- Ten cashiers
Ten cashiers are open at Tesco. Customers wait an average of 15 minutes. How many other cashiers have to open to reduce the waiting time by 4 minutes?
- Supermarket cashiers
When at the supermarket are opened only 2 cash people waiting in the front approximately 12 minutes. How many will shorten the average waiting time in a front where supermarket open another three cashiers?
- Driver
I drive at an average speed of 70km/h, I drive 10 thousand km. How long did it take me?
- Painters
Five painters painting the fence for eight days. How many days over will take work if paint the fence only four decorators?
- The orchard
4 temporary workers harvested the orchard in 9 days. How many temporary workers we need for six days?
- Cable car
The cable car will carry 1280 passengers in 40 minutes. How many people will be transported in 2.5 hours?
- Painters
Ten painters paint the school in 20 days. How many days do four painters paint the school at the same pace of work?
- Pumps
Five pumps pumped 1,800 hl of water for 3 hours. How many hectoliters of water pump same two powerful pumps for six hours?
- Mother and daughter
Mother is 44 years old, her daughter 14. How many years ago was her mother four times older than her daughter?
- Study
For 7 hours study, she scored a 75 so if she made 93 how many hours would she need to study?
- Two boats
The sightseeing boat sail at 25 km / h. The cruise take 6 hours. How long the another boat sails at 60 km/h?
- The work
The work was to be done by 150 workers. At the beginning of their work, their number reduced by 40, which increased the time of work by 5 and 1/3 of the schedule. How long did work take?
- Diggers
Eight diggers will do the job in 85 hours. After 21 hours, 3 diggers had to leave. How many hours will the work be done?
- Pumps
After the floods, four equally powerful pumps exhausted water from the flooded cellar in 6 hours. How many hours would take a drained out with three equally powerful pumps?
- Everyone drinks the same
24 bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same.
- Five pumps
The water tank is filled with two pumps in 48 minutes. How long would it take to fill it with 5 same pumps?
- Inlet and outlet
The pool has a capacity of 50 hl. The inlet pipe flows in 1 minute 1.25 hl, and the waste pipe outlet is draining the full pool in 50 minutes. How long will take the empty the full pool when both the inlet and outlet are opened at the same time?
- Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
Do you have an interesting mathematical word problem that you can't solve it? Submit a math problem, and we can try to solve it.
Do you want to convert time units like minutes to seconds? Simple proportion - math word problems. Time - math word problems.