Construction 82214

At the construction site, the sand that belongs to the mortar is sifted through a sieve. At the same time, 1/6 of the coarse sand falls through. Determine how many m3 of sand must be brought in to obtain 2 m3 of sifted sand.

Correct answer:

V1 =  2.4 m3

Step-by-step explanation:

V2=2 m3  r=161=61 661=6661=661=650.8333  V1   r = V2  V1=V2/r=2/65=2:65=2 56=52 6=512=512 m3=2.4 m3



Did you find an error or inaccuracy? Feel free to write us. Thank you!







Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Tip: Our volume units converter will help you convert volume units.

You need to know the following knowledge to solve this word math problem:

Related math problems and questions: