Sand sieve coarse
At the construction site, the sand that belongs to the mortar is sifted through a sieve. At the same time, 1/6 of the coarse sand falls through. Determine how many m3 of sand must be brought in to obtain 2 m3 of sifted sand.
Final Answer:

Tips for related online calculators
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Tip: Our volume units converter will help you convert volume units.
Tip: Our volume units converter will help you convert volume units.
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Sifted sand
At a construction site, sand used in mortar is sifted through a sieve. In the process, 1/6 of the coarse material does not pass through and is discarded. Determine how many cubic metres must be brought in to obtain two cubic metres of sifted sand. - Truck sand transport
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks? - A sand
A sand timer has 5 5/16 ounces of sand. If the sand falls at a rate of 2.5 ounces per minute, how many minutes will the timer last? Write your answer as a fraction. - Circle line tangent
Given a circle k(O; 2.5 cm), a line p: /Op/=4 cm, a point T: T belongs to p and at the same time /OT/=4.5 cm. We must find all the circles that will touch the circle k and the line p at point T. - Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material? - Insulating a house
Five workers are insulating a house at a pace that would allow them to finish the job in 18 days. After three days of work, two workers were called away to another construction site. In how many more days will the remaining workers finish the job? - Mr. Ben
Mr. Ben drives bricks to the construction site. If he drove three times a day, he would make bricks in 8 days. How many times a day would he goes every day to be done two days earlier?
