Sifted sand
At a construction site, the sand used in mortar is sifted through a sieve. In the process, 1/6 of the coarse sand falls through. Determine how many cubic meters must be brought in to obtain two cubic meters of sifted sand.
Correct answer:

Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Tip: Our volume units converter will help you convert volume units.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Tip: Our volume units converter will help you convert volume units.
You need to know the following knowledge to solve this word math problem:
algebrabasic functionsnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Construction 82214
At the construction site, the sand that belongs to the mortar is sifted through a sieve. At the same time, 1/6 of the coarse sand falls through. Determine how many m³ of sand must be brought in to obtain 2 m³ of sifted sand.
- Construction 82411
It should have taken four trucks 6 hours and 45 minutes to bring the sand to the construction site. After 90 minutes, one car broke down. How long did it take to transport the remaining sand in three trucks?
- Dana and sandbox
Dana helped her dad build a sandbox for her younger sister. The sandbox is shaped like a rectangular prism, 4 1/2 feet long and 4 feet wide. Dana used bags of sand to fill the sandbox 1/2 of a foot deep. Each bag contained 1/2 of a cubic foot of sand. How
- A sand
A sand timer has 5 5/16 ounces of sand. If the sand falls at a rate of 2.5 ounces per minute, how many minutes will the timer last? Write your answer as a fraction.
- Sand
The maximum weight of the car is 5000 kg. We must transfer 10 m³ of sand. How many times does a car have to go? (density of sand is 1500 kg/m3)
- Constructing 67634
During the construction of a 140-meter-long gas pipeline, a pit with vertical walls 1.5 m deep and 1 m wide must be created. A) How many cubic meters of soil must be dug up? B) We spread the excavated soil evenly on a field with dimensions of 70 m and 120
- Mortality tables
Mortality tables enable actuaries to obtain the probability that a person will live a specified number of years at any age. Insurance companies and others use such probabilities to determine life insurance premiums, retirement pensions, and annuity paymen