Statistics - math word problems - page 33 of 44
Number of problems found: 873
- Evening shift
While working the evening shift, Officer K took 8 hours to complete a task at his workstation, and Officer M took 10 hours to complete the same task at his workstation. How long would it take Officer K and M to complete the same task, each working at his
- Probability 82993
The probability of sprouting each avocado pit is 0.9. We planted 3 stones. What is the probability that exactly two of them will grow?
- Minutes 8081
I will drain the whole tub in 4 minutes. How long would it take to drain it if I added two more drain holes?
- Midpoint of segment
Find the distance and midpoint between A(1,2) and B(5,5).
- The temperature 36
The temperature over the course of a day was being monitored. In the morning, the temperature was −3°F. In the middle of the day, the temperature rose to 12°F. After dark, the temperature dropped again to −6°F. What was the average temperature for the day
- Panel house
The construction company has two groups of workers. Group A has more members than B. The Panel house was insulated by group A for ten days. They insulated the same block of flats together for 6 days. How many days would group B block insulate?
- Water current speed.
Two cities along the river are 100 km apart. The powerboat downstream runs for 4 hours, upstream for 10 hours. Determines the river's current speed.
- Two pumps
The first pump fills the tank in 24 hours, and the second pump fills the tank in another 40 hours. How long will it take to fill the tank if it operates both pumps simultaneously?
- Determine 3851
Michal would cut the fence himself in 12 hours. It would take Michal and Juraj 8 hours together. Determine how long it would take for Juraj to do the job.
- Water reservoir
One drain hole emptied the water from the tank for 20 hours, with the second drain for 30 hours. How long will the water drain from this tank if we open two drains simultaneously?
- Together 3
If Sally can paint a house in 4 hours, and John can paint the same house in 6 hours, how long will it take for both of them to paint the house together?
- Two diggers
There are two diggers. One digger digs a pit 77 hours per second, digging 1.2 times faster. a) how long did digging a pit with a second digger take? b) how long did it take to dig together?
- Distribute 82137
We have a profit of 40000e, and the work took 30 days. The first worker is promised 38% of the profit but only works for 15 days, the second worker is promised 33% of the profit and works for 20 days, and the third is promised 28% of the profit and works
- Blueberries 48771
Mirka picks up a bucket of blueberries in two hours. Lorenzo fills one-third of the bucket every hour. How long would it take to fill one bucket together to the brim?
- Tributaries 7678
We filled the pool with two tributaries: the first in 5 hours and the second in 8 hours. The father came and drained 1/8 of the water. How long before the pool fills with both tributaries?
- Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker does the next half of the work, it will take 25 hours. How long would it take to job them separately?
- Insert 7
Insert five harmonic means between 3 and 18
- Probability 5077
They have four types of cakes in the patisserie. Anna always buys two at a time. What is the probability that he will get two spikes today?
- The average 7
The average lifespan for cricket is 90 days, with a standard deviation of 13 days. If we assume that the lifespan of cricket is normally distributed, a. What is the probability a randomly selected cricket has a lifespan of fewer than 75 days? b. What is t
- Workers
The first worker completed the work in 40 hours, the second in 50 hours, and the third in 80 hours. How long will it take them to do the work together?
Do you have unsolved problem that you need help? Ask a question, and we will try to solve it. Solving math problems.
Looking for a statistical calculator? See also more information on Wikipedia.