Machines
There are three machines in the workshop. The first treats 280 parts for 3.7 hours, the second treats 460 parts for 2.7 hours, and the third treats 550 parts for 3.6 hours. How long will it take to make 2440 parts if all three machines are worked simultaneously?
Final Answer:

Tips for related online calculators
Looking for calculator of harmonic mean?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
Looking for a statistical calculator?
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
statisticsalgebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Calculate 67814
Two workers work in a workshop to produce the same product. The first worker worked 184 hours per month and produced 656 pieces of the product. The second worker worked 177 hours per month and produced 830 pieces of products. Calculate the hourly output o
- Simultaneously 17821
The reservoir is filled with the first pump in 30 hours, the second in 24 hours, and the third in 20 hours. How long does it take to fill the reservoir if all pumps are switched on simultaneously?
- Soda bottles factory
Two different filling machines fill soda bottles to order. If the first machine worked alone, it would need a third less time to complete the order. How long would it take each machine to complete the job independently if the faster machine worked for 96
- Three tributaries
It is possible to fill the pool with three tributaries. The first would take 12 hours, the second 15 hours, and the third 20 hours. The day before the summer season began, the manager opened all three tributaries simultaneously. How long did it take to fi
- Workers
The first worker completed the work in 40 hours, the second in 50 hours, and the third in 80 hours. How long will it take them to do the work together?
- Production 80661
The production of 4 machines takes a total of 80 hours. They make every machine for the same amount of time. How long does it take to produce 1 machine, 2 machines, or 5 machines?
- Hectoliters of water
The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water simultaneously?