Work word problems - page 32 of 40
Work Problems are word problems that involve different people doing work together but at different rates. Another problem involves pipes filling up a tank. Another name for these problems is working together word problems.We suggest solving working together word problems with the proportion. If we can complete a task in t hours, we can complete 1/t of the task in one hour.
Number of problems found: 781
- Tributary 3466
The swimming pool is filled with four inflow pipes in 9 hours. If one tributary is broken, how long will it be filled? - Calculated 3465
The master calculated that six looms would weave the ordered fabric in 15 hours. One condition appeared. How long before the ordered substance matches the remaining states? - Supply 3464
Hay stock is enough for four horses for 60 days. How long would this supply last for ten horses? - Tributaries 3458
At the swimming pool, they usually use three tributaries with the same power to fill the pool. Then the pool will fill in 5 hours. How many hours less would it take to fill the pool if they added 2 more inlets with the same capacity?
- Shelter 3446
The shelter buys a supply of food for 12 dogs for one week. How many days will this supply last if two more dogs are added to the shelter? - Five pumps
Three same pumps fill the tank with 50400 liters of diesel in 7 hours. How many liters of diesel will it take in 4 hours if we add two more of the same pumps and pump them the same way? How much more (or less) will they get if we add 2 of the same pumps a - Painted 3436
Mother and Pete painted a fence around the whole garden in 9 days. If Vlado helped them, how many days would it take them? - Cleaning 3434
During spring cleaning, the removal of scrap iron by truck would take 15 hours. With one tractor, it would take three times as long. In how many hours will the scrap iron be removed if the removal is carried out by a truck and two equally powerful tractor - Accepted 3423
The material for 83 masons of the company is enough for 12 days. How many days will this supply be enough for them if the company has accepted six more masons?
- Ninety-six 3420
Ninety-six soldiers will build a pontoon bridge in 5 hours. How long before the same bridge creates 54 soldiers? - Sawmill factory
Peter works in the factory. The bus stop is 10 km from the factory. Therefore, always when the bus arrives for Peter, the driver leaves the factory and takes him to work. They are coming to the saw exactly at 8:00. Today, the bus arrived 11 minutes earlie - Collection
John collected half a bucket of raspberries in 45 minutes, and Eva collected the whole bucket in an hour. How many minutes would it take to fill a bucket if the two children worked together? - Calculate 3320
The farmer has a supply of oats for 5 horses for 12 days. Calculate how many horses would consume the same supply of oats in 1 day. Calculate how many days it would take 6 horses to consume the same oats supply. (The daily ratio for one horse does not cha - Experienced 3318
An experienced tamer will wash an elephant in 40 minutes. It takes a temporary worker 2 hours. How long in a minute will a tamer and a temporary worker wash three elephants together?
- Modifications 3317
Workshop A can fulfill a specific order in 8 changes, workshop B in 10 modifications. How many shifts will the job be completed if workshop A works on only the first two shifts and both workshops work on the remaining shifts? - Simultaneously 3316
We would fill the water tank with one inlet in 36 minutes and the other in 45 minutes. How long will it take to fill the tank if water flows through the first inlet for 9 minutes and then both simultaneously? - Workers 3291
The broad workers will do the job in 22.5 days. How many workers still need to be hired to do the job seven days earlier? - Painters
Five painters painted the fence for eight days. How many days over will it take to work if they paint the fence with only four decorators? - Determine 3274
Nine cleaners clean 3150 m² of the floor in 7 days. Determine how many m² of floor eight cleaners will clean in 9 days.
Do you have homework that you need help solving? Ask a question, and we will try to solve it.