Workers digging
The three workers will dig one big pit in two days.
How many workers would dig seven large pits in three days?
How many workers would dig seven large pits in three days?
Final Answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Excavator pit days
Two excavators dig a pit in 12 days. How much shorter will this job take if 8 excavators dig the hole? In 3 or 9 days? - Digging companies
Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days, and company D for 24 days. Work began with companies C and D, but after three days, They joined the other two companies. How long did it take to dig a pit? - Excavation digging days
The workers dug one-quarter of the excavation on the first day, half the rest on the second day, and the remaining 15 m on the third day. How many meters did they dig on the first and second day? - Two diggers
There are two diggers. One digger digs a pit 77 hours per second, digging 1.2 times faster. a) how long did digging a pit with a second digger take? b) how long did it take to dig together? - Novak
Smith needed to dig up three of the same pit in the garden. The first pit was dug father alone for 15 hours. His second dig son helped him, and it did that in six hours. The third pit was dug son himself. How long does it take him? - Two Workers Digging Canal
The first worker digs a canal in 3 hours. The other will dig the trench in 4 hours. They will work 1 hour opposite each other and then together. How long will it take them? - Workers
Nine workers dig a 120-meter-long canal in eight hours. How long would it take five workers to dig a 200-meter-long canal?
