Workers 4949
The three workers will dig one big pit in two days.
How many workers would dig seven large pits in three days?
How many workers would dig seven large pits in three days?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Digging companies
Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days, and company D for 24 days. Work began with companies C and D, but after three days, They joined the other two companies. How long did it take to dig a pit?
- Excavators 82208
Two excavators dig a pit in 12 days. How much shorter will this job take if 8 excavators dig the hole? In 3 or 9 days?
- Workers 2
The worker dug the trench for 7 hours, and another worker for 10 hours. They recruited to work even one worker. Digging should be done for 2 hours. For how long would dig the third worker alone?
- Two diggers
There are two diggers. One digger digs a pit 77 hours per second, digging 1.2 times faster. a) how long did digging a pit with a second digger take? b) how long did it take to dig together?
- Two workers
Two workers will do certain work for 12 days. After eight days of working, one was removed, and the other finished the job alone in 10 days. For how many days would you do this work alone for each worker?
- Workers
Nine workers dig a canal 120 meters long for eight hours. For how long would digging five workers' canals be 200 meters long?
- 20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers