Complete 4849
The first sluice empties a complete pond in 45 days. If 2/3 of the pond is drained in 15 days, a second sluice is still needed for ten days. How many days would it empty itself through just the second sluice?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Emptied 3244
The pond is emptied with a sluice in 45 days. When 2/3 of the pond needs to be drained in 15 days, the second sluice gate will also open for ten days. How many days would the pond be emptied only by a second sluice? - Emptied 3252
If two gates are open, the company will empty the pond in 20 days. A larger sluice would empty in 30 days. How many days would he have emptied himself with only a small sluice? - Complete 23811
We ordered two parties of workers to replace the windows and doors. The first group would complete the task in 15 days. The second in ten days. How many days will they be able to exchange it together? - Workshops
The first workshop will do the robot itself in 15 days, and the second workshop in 10 days. They started together, but only the second workshop worked after three days. How many days will the work be done? - Three workshops
One workshop can complete the task in 48 days, the second in 30 days, and the third in 20 days. In how many days would the task be completed if all workshops worked? - Pond
Workers will empty a pond with two open floodgates in 20 days. A larger floodgate will empty the whole pond in 30 days. For how long would he be emptied with a smaller floodgate? - Production 24021
The plant has to complete the order in 40 working days. Production takes place in two workshops. In the first one, there are more workers; therefore, they would complete the order themselves in 70 working days. In the second workshop, they would complete - Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work. - Dimensions 16573
They drained the water from the full tank through three holes. 1/6 of the tank volume flowed through the first hole, 2/5 of the volume through the second hole, and 1/4 of the volume through the third hole. The tank has the shape of a cuboid with dimension - Identical 7683
In a hotel pool, the pool manager drains the water through two identical drains every 10 hours. How much time would he save in draining the pool if the water was drained through three more drains at the same flow rate? - Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe - Two workers
Two workers should fulfill specific tasks together for five days. If the first worker increased their performance twice and the second twice fell, it took them just four days. For how many days would he handle the entire task, the first worker himself? - Kilograms 5998
What is the weight of an empty water tank, and how many kilograms of water is in it? If the total weight a) 192 kg, would it drop to 132 kg after a third of the water weight is drained? b) 107 kg would increase to 132 kg after adding a quarter of the curr - Painters
One painter could paint a school for seven days. The second one does it for six days. It was necessary to paint the school in two days. The next painter was invited, and all worked together. How long would this painter paint the school itself? - Tractors 19713
Two tractors are working on plowing the field. If only the first tractor plowed, it would plow the field in 3 hours. The second tractor would plow the field by itself in 6 hours. How long will it take to plow if they work together, but the other starts wo - Working together on project
Two employees did working on the project. First, make it alone for 20 days, the second for 24 days. How many days will it take to complete the project if five days they work together, then first will take two days holiday, and after returning they complet - Picture frames
Destiny has to make 24 picture frames. Each frame uses 16 3/8 wood trim. she completed 2/3 on the first day. How many inches of wood trim is needed to complete the remaining frames on the second day?