Work word problems - page 33 of 43
Number of problems found: 842
- According 4543
Three workers received €2,850 for the work done. They divided them according to the time worked so that the first got 20% less than the second and the third €50 more than the second. How many euros did the second worker get?
- Together 4511
One tractor would sow the field in 3 hours and the other in 7 hours. How long before the fields grow together?
- Harvesters 4498
The first combine harvester will harvest the fields in 12 hours, and the second combine harvester in 8 hours. How long does it take for the same harvester to harvest the 3rd combine if all three harvesters harvest together in 2 hours?
- Simultaneously 4479
A worker would fill the tank with one inlet in 36 minutes, the other in 45 minutes. How long will it take to fill the tank if the water flows through the first inlet for 9 minutes and then both simultaneously?
- Materials 4405
Two trucks were supposed to load the building materials in 10 days. After 6 days of work, the first car broke down, and the second one carried building materials for another 9 days. How many days would the first and second cars take the building materials
- Completes 4234
The worker completes the work in 12 days, the second in 10 days. The first worker kicks himself for four days, then the second worker comes. How long will it take to dig?
- Operating 4230
The bearing has a lifespan of 8 years at a pressure of 4 bars and an operating time of 2 hours per day. The bearing has a service life of 8 years at a pressure of 1.5 bar and an operating time of 14 hours a day. What will be the service life of the bearin
- Work together
Michal and Dorota would do the work together in 2.25 hours. If Dorota had to do it herself, it would have taken her 6 hours longer than Michal. Determine when Dorota will do the work herself and when Michal will do it himself.
- Workers 4168
Ten workers managed to repair the road in 22 days. After four days, two more workers joined to speed up the work. How many days does it take to repair the road?
- Potatoes
Daniela and Michael would jointly dig potatoes for 7.5 hours. But if Daniela was working alone, she would take 2.5 hours more than if he were working with Michael. Determine how much for the work done by Michael himself and how much Daniela herself.
- Together 4158
Daniela and Michal would dig potatoes together in 7.5 hours. But if Daniela worked alone, it would take her 2.5 hours more than Michal. Find how much Michal would do and how much Daniela would do the work himself.
- Companies 4156
Company A mows the meadow in ten hours. Company B will cut the meadow with dynamite in six hours. How many hours would these companies mow two meadows if they worked together?
- Construction 4130
By improving the work process, constructing a family house saved CZK 111,600, which was 9% of the total budget. What was the original budget for a family house?
- Installation 4123
The team of installers is to carry out the installation in 20 days. By adding two fitters from the beginning of the work, the assembly was completed in 15 days. How many were on the team?
- Efficiency 4072
What kind of work did the mixer with an efficiency of 30% do when it did 4.5 kWh of work?
- Performance 4067
Twenty students will plant 1,200 trees in 4 hours. How many students do you need to plant 2100 trees in 3 hours at the same performance?
- Odd-numbered 4033
Mr. O. came up with two codes for the vault, which he alternates after a week. Both codes have the product of the digit 120. In an even week, it uses the smallest possible number as the code with this property. In the odd week, the largest. No number 1 in
- Three children
Three children eat eight chocolates in 6 days. How many chocolates do six children eat in 18 days?
- Independently 3874
Josef would do the work himself in 5 hours. Josef and Michal would do the work together in 3.5 hours. Determine how long it would take Michal to do the job independently.
- Determine 3851
Michal would cut the fence himself in 12 hours. It would take Michal and Juraj 8 hours together. Determine how long it would take for Juraj to do the job.
Do you have unsolved problem that you need help? Ask a question, and we will try to solve it. Solving math problems.