Pumps A and B

Pump A fill the tank for 12 minutes, pump B for 24 minutes. How long will take to fill the tank if he is only three minutes works A and then both pumps A and B?

Result

x =  9 min

Solution:


1/12 x + 1/24 (x-3) = 1

3x = 27

x = 9

Calculated by our simple equation calculator.







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation?

Next similar examples:

  1. Hectoliters of water
    pumps_7 The pool has a total of 126 hectoliters of water. The first pump draws 2.1 liters of water per second. A second pump pumps 3.5 liters of water per second. How long will it take both pumps to drain four-fifths of the water at the same time?
  2. Collection
    maliny_1 John has collected half a bucket of raspberries in 45 minutes, Eva collects the whole bucket in an hour. How many minutes it would take to fill a bucket if the two children work together?
  3. Dwarfs
    trpaslik Four dwarfs would prepare firewood for Snow White in580 minutes. After an hour and a half they recruit friends so that finished preparing the wood for 280 minutes. How many dwarfs they recruited?
  4. Construction of road
    truck_14 For the construction of the road dam, it is supposed to transport six trucks a total of 18 days. After three days, two more cars were sent to the construction site. How long will it take to carry the material?
  5. Strawberries
    strawberries Father collects strawberries himself in 4 hours, son in 14 hours. How long will it take them along when dad comes to help son collect strawberries after 3 hours?
  6. Sprayers
    postrekovac The vineyard can be sprayed first sprayer in 5 hours and with the second in 8 hours. How long would it take if we use sprayers both at once?
  7. Two looms
    stav On two different looms with different performance can be make required quantity of textile in 6 hours when both work together. On the first machine this quantity of the textile can make in 10 hours. How long should take make same quantity of textile on a s
  8. Novak
    novakovci Novak needed to dig up three of the same pit in the garden. The first pit dug father alone for 15 hours. His second dig son helped him and it did that in six hours. The third pit dug son himself. How long it took him?
  9. Painters
    3_painters One painter could paint a school for 7 days. The second one for 6 days. It was necessary to paint the school in two days. Next painter was invited and all worked together. How long would this painter painted the school itself?
  10. Welders
    svarec Welder do the job for six hours, the second one for 8 hours. How long do the job third welder if all together can do job in 2 hours?
  11. Working together on project
    work_10 Two employees working on the project. First make it alone for 20 days the second for 24 days. How many days will take to complete project if 5 days they work together then first will take two days holiday and after returning they completes a project toget
  12. Six years
    children_9 In six years Jan will be twice as old as he was six years ago. How old is he?
  13. Workers
    workers Two workers fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will do whole job a second worker?
  14. Lumberjacks
    stromy_17 Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
  15. Equation
    rovnice_3 Solve the equation: 1/2-2/8 = 1/10; Write the result as a decimal number.
  16. Unknown number
    nums Identify unknown number which 1/5 is 40 greater than one tenth of that number.
  17. Simple equation
    axes_1 Solve for x: 3(x + 2) = x - 18