Copiers

You need to know the following knowledge to solve this word math problem:
Related math problems and questions:
- Two xeroxes
The performances of the two copiers are in the ratio of 3: 4. A machine with higher power will make 7,200 copies in one hour. How many copies will both machines make together in 5 hours?
- Copiers
The new copier is copying a folder of papers 5 minutes faster than the old one. The operator used new, but out of toner and exchange took 5 min at that time copied on the old. The whole work was done in 9 min. How long would the work do only by the old co
- Four pavers
Four pavers would pave the square in 18 days. How many pavers do you need to add to the done work in 12 days?
- Diggers
Eight diggers will do the job in 85 hours. After 21 hours, three diggers had to leave. How many hours will the work be done?
- Workers
Two workers would fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will the second worker do the whole job?
- Work together
Two bricklayers are plastering a wall. The first would plaster it in 8 hours, the second in 12 hours. How many hours will they be done with the work if they work together?
- Workshops
The first workshop will do the robot itself in 15 days, and the second workshop in 10 days. They started together, but only the second workshop worked after three days. How many days will the work be done?
- Unknown number 17
Milada said, I am thinking of a number such that I evaluate expression x1/3; the expression's value would be 5. Which number is Milada thinking?
- Geometry: 78014
Good day, Even though it is a trivial task, I don’t know how to deal with it. This is analytic geometry: Find all integers a, b, and c such that the line given by the equation ax+by=c passes through the points [4,3] and [−2,1]. Thank you for your answer
- Apprentice 20753
The trained worker will do the work in 4 hours. The apprentice needs 6 hours for the same work. How many hours and minutes would they do this work if they worked together?
- Three painters
The three painters have painted bridges. The first would work done in 5 days, the second in 6 days, and the third in 7.5 days. How long will the bridge work if they work together?
- How many 18
How many times would five be distributed by 1/4, 3/8, 5/8, and 1?
- Seven workers
Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
- Two companies
The family ordered two companies to modify the garden. The first would be done in 20 days; the second would take 40% less time. How long will they work together if the second company started working when the first worked for four days?
- Quarter of an hour
If the clock showed a quarter of an hour more, it would be 10 minutes to 10 hours. How many hours do they show?
- Temperature 5
The temperature outside starts at 0 Fahrenheit. Over time the temperature changes at a rate of -0.6 Fahrenheit per hour. How long will it take for the temperature to reach -4.5 Fahrenheit?
- Password dalibor
Kamila wants to change the password daliborZ by a) two consonants exchanged between themselves, b) changes one little vowel to such same great vowel c) makes these two changes. How many opportunities do you have a choice?