Production 5609
The production plant fulfilled 1/4 of the monthly plan in the first 10 days of the month, 5/14 in the second decade, and 3/7 of the monthly plan in the remaining part of the month. Determine if the monthly plan has been met.
Correct answer:

Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
arithmeticnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Production 4704
The monthly production schedule of the two companies totaled 360 machines. When the first company met its plan at 105% and the second at 117%, the two companies produced 402 machines. Determine the original monthly schedules of both businesses.
- Machine particles
Since the start of the shift, 1,260 parts have already been produced on the press. This fulfilled 3/7 (three sevenths) of the daily plan. How many parts does the press still have to produce when the plan is to be fulfilled at 105%?
- Production 24021
The plant has to complete the order in 40 working days. Production takes place in two workshops. In the first one, there are more workers; therefore, they would complete the order themselves in 70 working days. In the second workshop, they would complete
- Two companies
Company A can fulfill the order in 12 days, and company B can fulfill the same order in 18 days. If only company A works on the order for the first two days and then both companies work on it for the remaining days, how many days will the order be fulfill
- Coal mine
The monthly plan of 17,000 tons of coal exceeded the mine by 1/25. How many tonnes of coal have been harvested from the mine above plan?
- Calculate 3502
The gardener planted 3/7 of the prepared tulips on the first and 1/7 on the second. What part of the prepared tulips did he already plant? What part does he have left? Can we calculate how many tulips there are? Which data is missing?
- Standardized 67974
The daily standardized output assumes the production of 530 components of the same type. The worker's actual production was 659 pieces. Indicate the percentage of the employees who met the plan.