Completed 64134
Six workers will do the work in 8 hours. How many workers must be added if the work is to be completed in 3 hours?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Mukls
The six workers' working group would order jobs completed within 21 working days. How many workers must be added to complete a contract in 14 working days?
- Embankment 56451
Twenty men will build a dam in 36 days if they work 10 hours daily. How many hours a day do 30 men have to work if the embankment is to be completed in 16 days?
- Two workers
The first worker would complete the work in 8 hours, the other in 6 hours. After two hours of joint work, the worker left the first worker to a doctor, and the others completed the work themselves. How many hours worked did the other worker himself?
- Completed 60913
The daughter needs 12 hours to clean up after the painters. The mother could do the same cleaning in 8 hours. How long will it take to clean up after the painters if the mother starts work only after the daughter has completed 2 hours?
- Two workers
One worker needs 40 hours to do a job, and the second would do it in 30 hours. They worked together for several hours, then the company recalled the second, and the first completed the job in 5 hours. How many hours did they work together, and how much di
- Part-timers
Six part-timers would take seven hours to pick strawberries. How long would this work take if two more temporary workers were added after three hours?
- Gas pipeline
Worker Molnár excavated the gas pipeline in 15 hours, worker Lakatoš in 12 hours, and worker Soukup in 10 hours. After how many hours of joint work will the excavation be completed?
- Workers
Two workers will construct the stage at the festival in 54 hours. Organizers need to shorten the assembly time by 42 hours. How many workers must the assembly company send?
- Diggers
Eight diggers will do the job in 85 hours. After 21 hours, three diggers had to leave. How many hours will the work be done?
- Two workers
The first worker completed the task by himself in 12 hours, and the second in 10 hours. After two hours of joint work left, the first worker went to a doctor, and the second finished the job himself. How many hours worked the second worker himself?
- Parquet floor
Three workers laid the parquet floor for 2.301 hour. The first would do this work alone 7 hours, the second in 6 hours. For how many hours would fulfill this work for the third worker if he worked alone?
- Summer tires
Three tire servants must change the summer tires on six cars in 2 hours. Mark's replacement would take 4.5 hours, Jirka would do it in 3 hours and 10 minutes, and Honza in 4 hours. Will they be able to replace all tires at the desired time?
- Together 39671
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together?
- Seven workers
Seven workers clear the glade in 22 hours. How many workers would need to be done in 8 hours?
- Weighted harmonic average
Ten workers will do some work in 2 minutes, five in 10 minutes, and three in 6 minutes. How many minutes per average worker per worker?
- Calculation 3620
The mine foreman calculated that 2 pumps must be in operation for 17.5 hours to drain the tunnel. He wanted to speed up the emptying of the shaft and added 3 more identical pumps. How long will it take to empty the shaft? Please also show your calculation
- Workers 3291
The broad workers will do the job in 22.5 days. How many workers still need to be hired to do the job seven days earlier?