Mukls
The six workers' working group would order jobs completed within 21 working days. How many workers must be added to complete a contract in 14 working days?
Correct answer:

Tips for related online calculators
Check out our ratio calculator.
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Workers
Ten workers must pave road street for 22 working days. After four days were for speeding up work, added two more workers. a) After how many work days now workers complete the paved road? b) How many working days does a total paved road take?
- Completed 64134
Six workers will do the work in 8 hours. How many workers must be added if the work is to be completed in 3 hours?
- Apprentices 30051
Four apprentices worked on a glove order for 20 days. How long would it take for eight apprentices to complete the contract in the same job?
- Complete 23811
We ordered two parties of workers to replace the windows and doors. The first group would complete the task in 15 days. The second in ten days. How many days will they be able to exchange it together?
- Three workshops
One workshop can complete the task in 48 days, the second in 30 days, and the third in 20 days. In how many days would the task be completed if all workshops worked?
- Three workers
Three workers, A, B, and C, have to work on a specific task. Workers A and B completed the task in 14 days, B with C for 23 days, and A with C for 13 days. How long would it take to complete the task for everyone alone? How long would it take to complete
- Two workers
The first worker would complete the work in 8 hours, the other in 6 hours. After two hours of joint work, the worker left the first worker to a doctor, and the others completed the work themselves. How many hours worked did the other worker himself?
- The factory
The factory z can complete an order in 12 days, factory p in 18 days. How many days does an order completed when the first two days work only the factory z and then both factories?
- Minute average
In a factory, four workers are assigned to complete an order received for dispatching 1400 boxes of a particular commodity. Worker A takes 4 minutes per box, Worker B takes 6 minutes per box, C takes 10 minutes per box, and D takes 15 minutes per box. Fin
- Adjusting 72554
Two working groups are adjusting the park. The first group would do the work in 15 days, and the second in 25 days. How many days will they do the work together?
- Mason with assistant
Mason had to complete the work in 10 days. Two and a half days later, his assistant arrived. Together they completed the work in the next three and a half days. How many days would he need an assistant for the same work?
- Panel house
The construction company has two groups of workers. Group A has more members than B. Panel house was insulated by group A for ten days. They insulated the same block of flats together in 6 days. How many days would group B block insulate?
- Engineering 54971
Two engineering companies have the same production program. The first company would fulfill their orders in 20 days. The second company in 16 days. How long will the companies fulfill the order if the first company starts working 2 days earlier?
- Reconstructing 23991
Three groups take turns reconstructing one piece of highway. The first group would finish the job themselves in 40 working days. The second group is in 24 working days, and the third group is in 30 working days. How many days do you do it together?
- Seamstresses 4635
Eight seamstresses have to complete the order in 16 days. After four days, the two seamstresses switched to another job. In how many days will the order be fulfilled?
- Two workers
Two workers will do certain work for 12 days. After eight days of working, one was removed, and the other finished the job alone in 10 days. For how many days would you do this work alone for each worker?
- Workers
Two workers would fulfill a certain task when working together for 5 days, the first if he worked himself done work in 13 days. How many days will the second worker do the whole job?