  • 10 workers
    10 workers will perform the assigned work in 8 days. How long will it take to get the job done if 6 workers work for six days and then another six join them?
  • Hour salary + fix
    Devin recently hired a contractor to do some necessary work. The contractor gave a quote of $395 for parts plus $62 an hour for labor. Let x  represent the number of labor hours worked. Write an algebraic expression to represent the total cost for the rep
  • Six painters
    Six painters paint an area of 120 m2 in 4 hours. How long does it take for 12 painters to paint 480 m2 with the same performance?
  • The farmer
    The farmer calculated that the supply of fodder for his 20 cows was enough for 60 days. He decided to sell 2 cows and a third of the feed. How long will the feed for the rest of the peasant's herd last?
  • What is bigger?
    Which ball has a larger volume: a football with a circumference of 66 cm or a volleyball with a diameter of 20 cm?
  • Hectares of forest
    12 workers plant 24 ha of forest in 6 days. In how many days will 15 people and 12 people plant the same area?
  • Working alone
    Tom and Chandri are doing household chores. Chandri can do the work twice as fast as Tom. If they work together, they can finish the work in 5 hours. How long does it take Tom working alone to do the same work?
  • Inlet minus outlet
    Water flows into the tank through two pipes and flows out of the third pipe spontaneously. Pipe A itself would fill the tank in 3 hours, pipe B itself would fill in 4 hours, and pipe C would flow out in 12 hours. How long will the tank be full if all thre
  • Two pipes
    How long will the pool be filled with a double supply pipe if it takes the pool to fill the first pipe by 4 hours longer and the second pipe 9 hours longer than both pipes open at the same time?
  • Two friends
    Peter can do all his work himself in 6 hours. Martin can do the same work himself in 8 hours. Peter worked first and then replaced by Martin. Whole work was done in 6.5 hours. Calculate how long Peter worked before replaced by Martin.
  • Three pumps
    We are filling the pool. The first pump would be filled in 12 hours, the second pump in 15 hours. If all three pumps were running at the same time, it would fill the pool for 4 hours. How long would the pool fill only with the third pump?
  • A report
    Maricris can type a committee report in 5 hours. Jane helped Maricris, and together they finished the report in 3 hours. How long would it take Jane to complete the report she had worked alone?
  • Soldier
    An experienced soldier digs a good trench in 30 hours. Two soldiers dug the same trench each 40 hours. How many hours will the ditch dig all three together?
  • Two diggers
    Two diggers should dig a ditch. If each of them worked just one-third of the time that the other digger needs, they'd dig up a 13/18 ditch together. Find the ratio of the performance of these two diggers.
  • Two masters
    The two masters will make as many parts as five apprentices at the same time. An eight-hour shift begins at 6 o'clock. When can a master finish the job to produce just as much as an apprentice for the whole shift?
  • Summer tires
    Three tire servants have to change the summer tires on 6 cars in 2 hours. Mark's replacement would take 4.5 hours, Jirka would do it in 3 hours and 10 minutes, and Honza in 4 hours. Will they be able to replace all tires at the desired time?
  • Bricklayer
    How much do we pay for a bricklayer laying a pavement in a square room with a diagonal of 8 m, if 1 sqm with work will cost for CZK 420?
  • Workers 9
    If two workers fix two windows in an hour how many windows can 18 workers fix in the same two windows?
  • Evening shift
    While working the evening shift, Officer K took 8 hours to complete a task at his work station and Officer M took 10 hours to complete the same task at his work station. How many hours would it take Officer K and Officer M to complete the same task workin
  • Together 3
    If Sally can paint a house in 4 hours, and John can paint the same house in 6 hours, how long will it take for both of them to paint the house together?

Do you have an exciting math question or word problem that you can't solve? Ask a question or post a math problem, and we can try to solve it.



We will send a solution to your e-mail address. Solved examples are also published here. Please enter the e-mail correctly and check whether you don't have a full mailbox.



Work word problems. Expression of a variable from the formula - math problems.