Highway tunnel
The company built the highway tunnel from two ends in the north-south direction. The average daily performance of the "northern party" rasters was higher than the average daily power of the "southern party" rasters. After 55 business days, both parties met, and tunneling with a total length of 253 meters was completed. How many meters of the tunnel did each party per day average dig if you know that the difference in their performance in the 55 work days was 11 meters?
Final Answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebrabasic operations and conceptsUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Production Percentage Increase
The new line-producing screws did not work at total capacity from the beginning. On Monday, she produced 20% of the daily norm. On Tuesday, she already met 4/5 of the daily norm. By what percentage was the number of screws made on Tuesday higher than on M - Construction work
A group of masons had to finish the rough construction within three days. On the first day, they completed a third of this task, but on the second day, they were delayed and did 15% less work than the first day. By what % relative to the second day must t - Seedling standard
Three gardeners planted 3,555 seedlings in one day. The first met the standard. The second exceeded the standard by 120 seedlings and the third by 135 seedlings. What was the daily norm? - Factory light savings
The factory hall is lit by 76 light bulbs, each of which has an input of 200W. Determine how much electrical work will be saved annually if the light is on an average of 100 minutes less per day. Consider 260 business days. - Performance
Two masons with the same performance would have been made of plaster for six days. One of them, however, has increased its daily performance by 50%. How long would it take them now to make plaster together? - Cars speeds
The distance from city A to city B is 108 km. Two cars were simultaneously started from both places. The speed of a car coming from city A was 2 km/h higher than the second car. What was the speed of each car if they met in 54 minutes? - Catering business
The Montealegre family has a catering business. At one birthday party, they charged their customers $11,767.50 for a party of 90 people and a service charge of $2,500.50. What was the average cost per person? Please show your solution.