Sidewalk cleaning
Three temporary workers will clean 60 meters of the sidewalk in 5 hours. How many meters of sidewalk will clean by seven temporary workers in 8 hours?
Final Answer:

Tips for related online calculators
Check out our ratio calculator.
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsGrade of the word problem
Related math problems and questions:
- Tmp workers
Three temporary workers cleaned 60 m of the walkway in 5 hours. How many meters of the walkway were cleared by seven volunteers for eight hours? - Additional Workers Needed
Certain work was to be done by 21 workers during an eight-hour workday, due in 12 days. After five days, temporary workers came to their aid. They all worked together for 7 hours a day and finished the job in 6 days. How many part-timers were there? - Sidewalk
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. In the picture, the sidewalk is shown in gray. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. - In the Gargen
Workers will pave a 1-meter-wide sidewalk in the garden with tiles around the block-shaped pool. The dimensions of the bottom of the pool are 8.5 meters and 6 meters. The height of the pool walls is 2 meters. How many m² of pavement will be laid with tile - 3 pupils
Three pupils cleaned 10 meters of the stream in 1 hour. How many meters of the stream will clean 18 students in 4 hours? - Fruit harvest
Five workers harvested fruit in 150 hours. How many temporary workers have to work to harvest fruit in 250 hours? - Apple worker combing
Two temporary workers comb apples from 15 apple trees in 5 hours and 20 minutes. After two hours, three other temporary workers came to help them. How long did it take to comb apples from these 15 trees?
