Gas pipeline
Worker Molnár excavated the gas pipeline in 15 hours, worker Lakatoš in 12 hours, and worker Soukup in 10 hours. After how many hours of joint work will the excavation be completed?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Two workers
The first worker completed the task by himself in 12 hours, and the second in 10 hours. After two hours of joint work left, the first worker went to a doctor, and the second finished the job himself. How many hours did the second worker work himself? - Two workers
The first worker would complete the work in 8 hours, the other in 6 hours. After two hours of joint work, the worker left the first worker to a doctor, and the others completed the work themselves. How many hours worked did the other worker himself? - Constructing 67634
During the construction of a 140-meter-long gas pipeline, a pit with vertical walls 1.5 m deep and 1 m wide must be created. A) How many cubic meters of soil must be dug up? B) We spread the excavated soil evenly on a field with dimensions of 70 m and 120 - Continued 7310
In one workshop, they will do the given work in 15 days; in another workshop, where more members work, they will do the given work in 10 days. After three days of joint work, only the larger workshop continued the assigned work. In how many days will he f
- Completed 64134
Six workers will do the work in 8 hours. How many workers must be added if the work is to be completed in 3 hours? - Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - Renovate 7342
The first company would renovate the complex in 30 hours. Another company would fix it in 20 hours. But the first company left after 5 hours of joint work. How long will it take to renovate the site?