Continued 7310
In one workshop, they will do the given work in 15 days; in another workshop, where more members work, they will do the given work in 10 days. After three days of joint work, only the larger workshop continued the assigned work. In how many days will he finish the work in this workshop?
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Workshops
The first workshop will do the robot itself in 15 days, and the second workshop in 10 days. They started together, but only the second workshop worked after three days. How many days will the work be done? - Painters
The first team of painters would paint the bridge in 15 days, the second in 10 days. After three days of working together, the second team goes out and continues only with the first team. How many days took the second team to finish painting the bridge? - Construction 81294
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work. - Delivering 80805
The courier company delivers the ordered goods through the e-shop. If the delivery were made by 2 cars, it would be completed in 6 hours. However, after 4 hours, the first car's driver stopped delivering, and the second car continued to deliver for anothe
- Working together
Two people will do the work in 12 days. They worked together for eight days. Then only one worked for ten days. How many days would each of them do the work if he worked alone? - Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - 10 workers
Ten workers will perform the assigned work in 8 days. How long will it take to get the job done if six workers work for six days, and then another six join them? - Reassigned 82404
Five grinders grind 120 products in 12 hours. After 4 hours of work, another 11 grinders were reassigned to the workshop. Will he complete the entire job in 6 hours? - Gas pipeline
Worker Molnár excavated the gas pipeline in 15 hours, worker Lakatoš in 12 hours, and worker Soukup in 10 hours. After how many hours of joint work will the excavation be completed?
- Michael 42461
Michael will read the book in 8 days if she reads 15 pages daily. How many pages does she have to read per day if she wants to finish the book six days after the start of reading? How many pages does the book have? - Emptied 3252
If two gates are open, the company will empty the pond in 20 days. A larger sluice would empty in 30 days. How many days would he have emptied himself with only a small sluice? - Two painters
Two painters are assigned to finish painting the houses in a housing project. John can finish a house in 4 days. Kurt painted it in 3 days. How long would it have taken if John and Kurt worked painting the house together? - Five people
Five people can finish painting a wall in 4 hours if only two people are available. How many hours do they have to work to finish the same job? - Two workers
Two workers will do certain work for 12 days. After eight days of working, one was removed, and the other finished the job alone in 10 days. For how many days would you do this work alone for each worker?
- Renovate 7342
The first company would renovate the complex in 30 hours. Another company would fix it in 20 hours. But the first company left after 5 hours of joint work. How long will it take to renovate the site? - Efficiently 65484
In the first workshop, there are 3 workers; in the second workshop, 2 work equally efficiently. They worked on the order together, and for the last 2 days, only workers from the first workshop. If only the first workshop were working, the order would be c - Planting 27201
In the forest, there are 84 workers employed in planting saplings. Working 10 hours a day, they would finish the job in 24 days. After 7 days, 14 workers leave. How long will it take the others to finish planting the saplings if they work 12 hours a day f