Cross-section 4507
How much soil needs to be removed when digging a 200-meter long ditch whose cross-section is an isosceles trapezoid with an area of 4812.5 cm²?
Correct answer:
Tips for related online calculators
Do you know the volume and unit volume, and want to convert volume units?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
Related math problems and questions:
- Cross-section 8171
How many m³ of soil is to be excavated when digging a 120 m long ditch, the cross-section of which is an isosceles trapezoid with bases of 2.3 m and 3.3 m, if the depth of the trench is 90 cm? - Cross-section 79984
A ditch with a cross-section in the shape of an isosceles trapezoid with bases of 3 m and 5 m and arms of length 2 m is 2.5 meters deep and 10 meters long. How many cubic meters of soil did they have to excavate when digging it? - Cross-section 35233
How much soil is needed to dig a 200m long ditch, the cross-section of which is a square with an area of 4812.5 cm2 - Cross-section 33541
How many m³ of soil must be moved when digging a straight trench 170 m long, the cross-section of which is an isosceles trapezoid with bases of 150 cm and 80 cm, and arms are 90 cm long?
- The ditch
Ditch with a cross-section of an isosceles trapezoid with bases 2m and 6m deep 1.5m. How long is the slope of the ditch? - Embankment
The railway embankment 300 m long has a cross-section of an isosceles trapezoid with bases of 14 m and 8 m. The trapezoidal arms are 5 m long. Calculate how much m³ of soil is in the embankment. - Road embankment
Road embankment has a cross-section shape of an isosceles trapezoid with bases 5 m and 7 m and 2 m long leg. How many cubic meters of soil is in embankment length of 1474 meters? - The trench
Calculate how many cubic meters of soil needs to be removed from the excavation in the shape of an isosceles trapezoid. The top width is 3 meters, the lower width is 1.8 m, the excavation depth is 1 m, and the length is 20 m. - Cross-section 17871
The road embankment has a cross-section of an isosceles trapezoid with bases 16 m and 10 m long and with arms 5 m long. How many cubic meters of soil is in the 400 m long dam?
- Excavation 8581
When building a new road, excavating a 280m long road in the ground was necessary. The bottom width, where the road runs, was 20m wide. At the top, the entire excavation was 30m wide. The depth of the excavation is 6 m. How much m³ of soil had to be remov - Cross-section 5048
A path will lead to an embankment across the floodplain. The embankment will be 2 km long and have the shape of an isosceles trapezoid in cross-section with base lengths of 12 m and 8 m and a height of 2 m. Calculate the volume of material needed to build - Drainage channel
The cross-section of the drainage channel is an isosceles trapezoid whose bases have a length of 1.80 m and 0.90 m, and the arm has a length of 0.60 meters. Calculate the depth of the channel. - Cylinder 5123
The well has the shape of a cylinder with a base diameter of 1.2 m. From the surface to the surface, it is 4 m, and the water depth is 3.5 m. How many m³ of soil had to be dug when digging the well? How much is water (in m3) in the well? - Embankment
The perpendicular cross-section of the embankment around the lake has the shape of an isosceles trapezoid. Calculate the perpendicular cross-section, where the bank is 4 m high, the upper width is 7 m, and the legs are 10 m long.
- Dimensions 83226
Calculate the weight of an iron bar 1.2 m long, whose cross-section is a trapezoid with dimensions a=10 cm c=8 cm and the distance between the bases v=6 cm. As we know, 1 cubic meter of iron weighs 7800 kg. - Chocolate roll
The cube of 5 cm chocolate roll weighs 30 g. How many calories will contain the identical chocolate roller of a prism shape with a length of 0.5 m whose cross-section is an isosceles trapezoid with bases 25 and 13 cm and legs 10 cm? You know that 100 g of - Tunnel boring
How much material did they dig when cutting the 400m long tunnel? The area of the circular segment, which is the cross-section of the tunnel, is 62m².