Cross-section 5558

How many m² of sheet metal is needed to cover 4 m high chimneys with a rectangular cross-section with dimensions of 2.5 m and 1.2 m? Add 1/20 to the folds.

Correct answer:

S =  31.08 m2

Step-by-step explanation:

c=4 m a=2.5 m b=1.2 m  S1=2 c (a+b)=2 4 (2.5+1.2)=5148=29.6 m2  k=1+1/20=2021=1.05  S=k S1=1.05 29.6=25777 m2=31.08 m2



Did you find an error or inaccuracy? Feel free to write us. Thank you!







Tips for related online calculators
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.

You need to know the following knowledge to solve this word math problem:


 
We encourage you to watch this tutorial video on this math problem: video1   video2

Related math problems and questions: