The site manager, based on the length of the excavation, estimated that the whole excavation for laying a plastic pipe bringing water to the kindergarten building could be carried out by Mr. Demeter together with Mr. Vondrák in 1.2 shifts. From experience he knew that the difference between the work performance of Mr. Demeter and Mr. Vondrák per 1 shift can be expressed as one sixth of the length of the excavation. In how many shifts was Mr. Demeter able to carry out the entire excavation alone, and Mr. Vondrák alone, if you know that Mr. Demeter was a more efficient digger than Mr. Vondrák?
Final Answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Excavation machine distribution
Excavation work was carried out by nine double-performance machines, which excavated 420 meters of excavation in one day. How many were there if the more powerful machine excavated 420 meters in a week (7 days) and the less powerful engine excavated 280 m - Mason shift sickness
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - The temperature 33
The temperature in Baguio City was 18.6 degrees Celsius, while in Tagaytay City was 22.5 degrees Celsius. What was the estimated difference between the two cities' temperatures? A. 6 degree celcius B. 5 degree celcius C. 4 degree celcius D. 3 degree celci - Lathe shaft production
The performance of three lathes can be expressed by the ratio 3:5:8. The most powerful lathe produces 136 shafts per shift. How many shafts did each of the remaining lathes make per shift? - Workman - shift
The worker produces 300 components per shift. If his performance gradually increased by 3 components every shift, how many components would be produced in the 18 shifts? - Diggers
The excavation was carried out in 4 days, and five workers worked on it for 7 hours daily. Determine how long it would take to excavate if seven workers worked on it 8 hours a day. - Maximize profit
The manufacturer is deciding whether to carry out a check on his products or to ship the products without check and in case of a defective product to repair it at his expense within the warranty. At the time of the decision about the introduction of outpu