Paving Company Ltd
Roadster's Paving Company used 6 6/8 tons of cement to pave Hunter's street and 9 5/8 tons of cement to pave Jayden's street. How much cement did Roadster's Paving Company use in all?
Final Answer:

Tips for related online calculators
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Need help with mixed numbers? Try our mixed number calculator.
Need help with mixed numbers? Try our mixed number calculator.
You need to know the following knowledge to solve this word math problem:
arithmeticnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Paving 2
A construction company needs 8 working days to pave the pavements on two streets if all 6 pavers work. However, only 4 pavers are available because the other two have been reassigned. How many working days will it take the group of 4 pavers to complete th - Sidewalk paving time
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers - Tiles path
A rectangular park measures 24 m X 18 m. A path 2.4 m wide is constructed all around it. Find the cost of paving the path with cement tiles of size 60 cm X 40 cm at the rate of $5.60 per tile. - Square paving calculation
According to the plan, seven pavers were to pave the square in 14 days. After two days of work, another 5 pavers came to help them. How many days from the arrival of the pavers will the work be completed? (tile performance is the same) - Sidewalk paving calculation
According to the standard, seven tiles can pave the sidewalk in 12 shifts. After three shifts, one worker went on holiday. In how many shifts were the sidewalk paved? - Diamond tile paving
How many diamond-shaped tiles with a side of 25 cm and a height of 20 cm are needed to pave a rectangular courtyard with sides of 30 m and 28 m if the joints represent 1/20 of the area? - Warehouses
To four warehouses is going cement in 50 kg bags, from first one third to the second quarter of the total. The third store got two-thirds of the rest, and the last 120 tons came to fourth. How much cement is in all warehouses, and how much got everyone?
