Algebra - math word problems - page 24 of 302
Number of problems found: 6040
- Taps and a tank
A tap can fill a tank in 6 hours. After half the tank is filled, three more similar taps are opened. What is the total time taken to fill the tank completely?
- A bank
A bank reported that x/12 more first-time buyers took a mortgage out last month. If a quarter more mortgages were taken out, what number (x) is missing?
- Transformer 3
A 200/115 V transformer has an LV (Low voltage) side resistance of 0.06 Ohm. What is the resistance referred to HV side (high voltage)?
- Speed Adjustment
By increasing the speed of his car by 15 km/h, a person covers a 300 km distance in an hour less than before. What was the original speed?
- Two workers 10
Worker P can do a work 3 times faster than Q and therefore takes 40 days less than Q.Find the time in which P and Q can complete the work individually.
- The average 16
The average of 50 numbers is 38. If the two numbers 45 and 55 are not considered, what will be the average of remaining numbers?
- Manday, manhour
Job problem: 10 men can make 20 toys in 12 days working 12 hours a day.Then, in how many days can 24 persons make 32 toys working 16 hours a day?
- Worker 25
Worker A can do 2/3 of a certain work in 12 days and B can do 1/6 of the same work in 4 days, Find in how many days will they together complete the work?
- Susan 5
Susan has a water tank in his back garden that can hold up to 750L in water. At the start of a rainy day (at 0:00) there is 165L in the tank, and after a heavy day’s rain (at 24:00) there is 201 L in the tank. Assuming that the rain fell consistently duri
- Average age 4
The average age of 31 people in a group is 19. If one person is reduced to 18, the average age becomes 18. Find the age of the reducing person.
- The river
The river flows at 4 km/h. A boat can go downstream thrice as fast as upstream. Find the speed of the boat in still water.
- Working together
Zeru can complete a certain job in 5 days, and Tulu can complete the same job in 3 days. How long will they complete the job if they work together?
- Correct mean and CV
For a group of 100 students, the mean and coefficient of variation of their marks were found to be 60 and 25, respectively. Later, it was found that the scores 45 and 70 were wrongly entered as 40 and 27. Find the corrected mean and coefficient of variati
- Usual speed 2
A passenger train takes 1 h less for a journey of 120 km.If its speed increased by 10 k/h from its usual speed. What is its usual speed?
- A long train
A train passes a standing man in 6 sec and 210 m long platform in 16 s . Find the length and the speed of the train.
- Move the average
If the average of 5 numbers is 20, the number which should be added to first number to make the average becomes 30?
- Family members
Three years ago, the average age of a family of five members was 27. The present average age is also 27 after a child is included in the family. Find the age of the child.
- Usual speed
If the usual speed is reduced by 5 km per hour, a train takes 2 hours more to cover a distance of 300 km. Find the usual speed.
- A data
A data set has the sample mean =14 and the sum of the data values=294. How many values are there in the data set?
- A boat 3
A boat takes 1 hour longer to go 36 km up a river than to return. If the river flows at 3 km/h, find the rate at which the boat travels in still water.
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.