- The mean 2
The mean cost of 4 items was $39.96. The first item cost $28.50, the second item cost $41.25, and the third item cost $50. Find the cost of the fourth item. - One combine
One combine harvester can harvest a field of corn in 4.5 hours. Another harvester can harvest the same field in 3 hrs. If the farmer uses the two harvesters at the same time. How long will it take to harvest the entire field? - Tadeo
Tadeo volunteered at the library 6 times as many hours over the weekend as Dylan. Together, they volunteered a total of 14 hours. How many hours did each person volunteer over the weekend? Write a system of equations that represents the situation. Let x r - A car miles
A car begins heading along a path at 50 mph. A second car begins an hour later, along the same path traveling at 70 mph. For how long will the first car travel when the second car overtakes it? - The average 19
The average age of a class was 15 years. When 5 boys whose average age was 12 years 6 months were admitted in the class, the average was reduced by 6 months. How many students were there in the class originally? - The tourist
A man traveled a distance of 61 km in 9 hours. He traveled partly on foot at 4 kmph and party on bicycle at 9 kmph. Find the distance traveled on foot. - Walker
Walker A takes 3 hours more than B in walking 30 km. If A doubles his speed, he will take 2 h less than walker B. Find the speeds of walkers A and B . - A bank
A bank reported that x/12 more first-time buyers took a mortgage out last month. If a quarter more mortgages were taken out, what number (x) is missing? - Transformer 3
A 200/115 V transformer has an LV (Low voltage) side resistance of 0.06 Ohm. What is the resistance referred to HV side (high voltage)? - Speed Adjustment
By increasing the speed of his car by 15 km/h, a person covers a 300 km distance in an hour less than before. What was the original speed? - Two workers 10
Worker P can do a work 3 times faster than Q and therefore takes 40 days less than Q.Find the time in which P and Q can complete the work individually. - The average 16
The average of 50 numbers is 38. If the two numbers 45 and 55 are not considered, what will be the average of remaining numbers? - Susan 5
Susan has a water tank in his back garden that can hold up to 750L in water. At the start of a rainy day (at 0:00) there is 165L in the tank, and after a heavy day’s rain (at 24:00) there is 201 L in the tank. Assuming that the rain fell consistently duri - Manday, manhour
Job problem: 10 men can make 20 toys in 12 days working 12 hours a day.Then, in how many days can 24 persons make 32 toys working 16 hours a day? - Worker 25
Worker A can do 2/3 of a certain work in 12 days and B can do 1/6 of the same work in 4 days, Find in how many days will they together complete the work? - Taps and a tank
A tap can fill a tank in 6 hours. After half the tank is filled, three more similar taps are opened. What is the total time taken to fill the tank completely? - Average age 4
The average age of 31 people in a group is 19. If one person is reduced to 18, the average age becomes 18. Find the age of the reducing person. - Correct mean and CV
For a group of 100 students, the mean and coefficient of variation of their marks were found to be 60 and 25, respectively. Later, it was found that the scores 45 and 70 were wrongly entered as 40 and 27. Find the corrected mean and coefficient of variati - The river
The river flows at 4 km/h. A boat can go downstream thrice as fast as upstream. Find the speed of the boat in still water. - Working together
Zeru can complete a certain job in 5 days, and Tulu can complete the same job in 3 days. How long will they complete the job if they work together?