Basic operations and concepts - math word problems - page 224 of 323
Number of problems found: 6446
- Inlet and outlet
The pool has a capacity of 50 hl. The inlet pipe flows in 1 minute 1.25 hl, and the waste pipe outlet drains the full pool in 50 minutes. How long will it take to empty the entire pool when both the inlet and outlet are opened simultaneously? - Transformer
Solve the textbook problems - transformer: a) N1 = 40, N2 = 80, U2 = 80 V, U1 =? b) N1 = 400, U1 = 200 V, U2 = 50 V, N2 =? - 4 pipes
The tank flows out by four pipes in 6 hours 120 hl water. How much water flows out of 5 pipes of the same diameter in 14 hours? - Cyclist and Motorcyclist Time
The cyclist covered a certain distance in 6 hours and 15 minutes. How long will it take for a motorcyclist to travel five times more if he travels three times faster? - Similarity of two triangles
The KLM triangle has a side length of k = 6.3cm, l = 8.1cm, m = 11.1cm. The triangle XYZ has a side length of x = 8.4cm, y = 10.8cm, z = 14.8cm. Are triangle KLM and XYZ similar? (write 0. If not, if yes, find and write the coefficient of a similarity) - Wagon assembly ways
How many ways can we assemble five wagons when sand is in three wagons and cement in two? - Match course possibilities
How many different courses could the match between AC Michalovci and Juvent Turiec have, which ended 2:1? - Team girl composition
How many different 6-member teams can be made up of seven boys and four girls if there are two or four girls in the team? - Number selection probability
If we choose four numbers from 1 - 20, what is the probability that 6 or 10 will be among them? - Workers
Workers are digging a jump pit in the schoolyard. The pit is cuboid in shape, with a length of 5 m, a width of 20 dm, and a depth of 36 cm. They excavate 0.4 cubic meters of soil an hour. How much time (hours and minutes) is needed to excavate this pit? - Four swords
Obelix has three helmets, four swords, and five shields. How many words must you make at the blacksmith forge Metallurgix to be able to walk another 90 days in unique armor? - Granulate for pH Adjustment
Bathing water should have a pH value in the range of 6.8 - 7.2. How much granulate should we add to increase the pH value from 6.2 to 7 if a dose of 100g/10m³ increases the pH by approx. 0.1? P.S. It's not 800 grams. - Two ports
Two ships commute along the same route between the ports of Mumraj and Zmatek. They spend negligible time in ports, turn around immediately, and continue sailing. At the same time, a blue ship departs from the port of Mumraj, and a green ship departs from - Sprinter
Sprinter runs the relay 4 x 400 m to the handover at a 42 km/h speed. A second runner is at the start of the handover area 20 m long and runs when it is the first sprinter at a distance of 10 m. Calculate the speed at which the second runner must run to t - Hockey Championships
At the 2021 World Hockey Championships, there are eight teams in Group A, each playing seven matches. There are 4 points for each team to gain points (3-2-1-0), but it is always paired with the opponent's points ( 0-1-2-3). How many points are there possi - Car consumption
When driving in the city, the car has an average consumption of k liters of gasoline per 100 km, but when driving on the highway, it consumes an average of 20% liters less. Express the consumption of a car if it travels 25 km in the city and 75 km on the - Level of significance
At a certain college, it is estimated that 25% of the students have cars on campus. Does this seem to be a valid estimate if, in a random sample of 90 college students, 28 are found to have cars? Use a 0.05 level of significance. - Average wage
Four workshop workers had a basic hourly wage of € 8.50. Eight employees € 9.60, five employees € 10.90. What was the average basic hourly wage of workshop workers, and what will be if the hourly rates increase by 10% - Bell copper tin
Nine kilograms of bell metal contain 7 kg of copper, the rest of which is tin. How much copper and how much tin were used to cast five bells? Each of the two larger bells weighed 535kg, and each of the remaining three smaller ones weighed 286kg. - Six workers
Six workers earned a total of CZK 12,600 per week on the construction site (5 working days). How much do seven workers earn in 10 days with the same daily average salary?
Do you have homework that you need help solving? Ask a question, and we will try to solve it. Solving math problems.
