Number of problems found: 769
- Corrects 83017
The new teacher corrects papers for 9 hours, and the older one fixes them in 6 hours. How much will they repair together? - Together 65074
Jana washes 20 windows alone in 4 hours. Petra would be able to do it in 6 hours. How long will it take to work together? - Two diggers
There are two diggers. One digger digs a pit 77 hours second, digging 1.2 times faster. a) how long took to dig a pit second digger b) how long took it to dig together - Probability 30421
There are 25 students in the class, 12 of whom are not ready for math. There are five students in the math class. What is the probability of at least 3 being math-ready? - Completes 4234
The worker completes the work in 12 days, the second in 10 days. The first worker kicks himself for four days, then the second worker comes. How long will it take to dig? - Two pumps
Pump A takes twice as long to fill a tank as B. Together, they take 2 hours to fill the tank. How long does each one take to fill the tank by itself? - Turners
Two turners perform joint work in 3 hours. The first-turner would perform the job himself in 7 hours. How long would the same job last for a second-turner if he worked alone? - Two rooms
A woman cleans the room in 30 minutes, and a man in 90 minutes. How long will it take them clean two rooms? - Christmas trees
The salesman sold Christmas trees: spruce for € 22, pine for € 25, and fir for € 33. In the morning, he had the same number of spruce, fir, and pine. In the evening, he had all the trees sold for € 3,600. How many trees does the day salesman sell? - Summer tires
Three tire servants must change the summer tires on six cars in 2 hours. Mark's replacement would take 4.5 hours, Jirka would do it in 3 hours and 10 minutes, and Honza in 4 hours. Will they be able to replace all tires at the desired time? - Water mixing
We mix 2 liters of water at 100 degrees Celsius warm and 18 liters of water at 32 degrees Celsius warm. What temperature will the water have after mixing? - Together 3781
Milos would do the work himself in 5 hours. How much would it take Dan to do the job together in two hours? - ICE train
German runways test a new ICE train between Munich and Berlin. The train runs to Berlin at a slow speed of 100 km/h. Back from Berlin goes faster. How quickly did the train have to go on a return trip so that the average train speed for both journeys woul - Apartment 81654
A woman cleans an apartment in 8 hours and a man in 10 hours. How many hours will they clean together? - Divide line segment
Find the point P on line segment AB, such that |AP| = r |AB|. Coordinates of endpoints: A = (−2, 0, 1), B = (10, 8, 5), ratio r = 1/4. - Production 24021
The plant has to complete the order in 40 working days. Production takes place in two workshops. In the first one, there are more workers; therefore, they would complete the order themselves in 70 working days. In the second workshop, they would complete - The factory
The factory z can complete an order in 12 days, factory p in 18 days. How many days does an order completed when the first two days work only the factory z and then both factories? - Tributaries
The first tributary fills the pool with water in 15 hours. The second tributary fills the pool in 10 hours. For how many hours is the pool filled with both tributaries? - Pedestrians 32231
One pedestrian walked the 16km track in 3.12 hours Two pedestrians walked the 18km track in 3.18 hours Which one had a higher average speed on its track? - Business 24751
Dad drove a business trip to a place 348 km away. He arrived at the scene after four hours. What was the average speed?
Do you have homework that you need help solving? Ask a question, and we will try to solve it.