Two squares

Two squares whose sides are in the ratio 5:2 have sum of its perimeters 73 cm. Calculate the sum of area this two squares.

Result

S1+S2 =  197.1 cm2

Solution:

Solution in text S__1+S__2 =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




Do you have a linear equation or system of equations and looking for its solution? Or do you have quadratic equation?

Next similar examples:

  1. Garden
    garden_1 Area of square garden is 6/4 of triangle garden with sides 56 m, 35 m and 35 m. How many meters of fencing need to fence a square garden?
  2. Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection dig for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of excavation they met?
  3. Forestry workers
    forestry_workers In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days is needed to complete planting trees in nurseries by others, if they will work 10 hours a da
  4. Bonus
    moeny Gross wage was 527 EUR including 16% bonus. How many EUR were bonuses?
  5. Troops
    regiment Route is long 147 km and the first day first regiment went at an average speed 12 km/h and journey back 21 km/h. The second day went second regiment same route at an average speed 22 km/h there and back. Which regiment will take route longer?
  6. Motion problem
    dragway From Levíc to Košíc go car at speed 81 km/h. From Košíc to Levíc go another car at speed 69 km/h. How many minutes before the meeting will be cars 27 km away?
  7. Wood dividing
    meter_23 Which equation calculates the number of 1/3-foot pieces that can be cut from a piece of wood that is 7 feet long?
  8. Lumberjacks
    stromy_17 Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if 5 workers added to it after 4 days?
  9. The King
    gold_4 The King wants to divide his sons equally. He has 42 rubies and 45 diamonds. How many sons and how will they share them?
  10. Four workers
    wood_6 Four workers will lay the floor of the gym in six hours. After an hour of working together, one of the workers left to the doctor. How long before the remaining three workers finish their work?
  11. MG=7x-15,
    segment_6 MG=7x-15, FG=33, x=? Point M is the midpoint of FG. Find unknown x.
  12. Midpoint 6
    segment_5 FM=8a+1, FG=42, a=? Point M is the midpoint of FG. Find unknown a.
  13. Midpoint 5
    segment_4 FM=3x-4, MG=5x-26, FG=? Point M is the midpoint of FG. Use the given information to find the missing measure or value.
  14. Find midpoint
    midpoint FM=5y+13, MG=5-3y, FG=? M is the midpoint of FG. Use the given information to find the missing measure or value.
  15. Inlet minus outlet
    inlets_6 Water flows into the tank through two pipes and flows out of the third pipe spontaneously. The pipe A itself would fill the tank in 3 hours, the pipe B itself would fille in 4 hours, and the pipe C itself would flow out in 12 hours. How long will the tank.
  16. Poplar
    topole How tall is a poplar by the river, if we know that 1/5 of its total height is a trunk, 1/10th of the height is the root and 35m from the trunk to the top of the poplar?
  17. Construction of road
    truck_14 For the construction of the road dam, it is supposed to transport six trucks a total of 18 days. After three days, two more cars were sent to the construction site. How long will it take to carry the material?