Workers
Workers are digging a jump pit in the schoolyard. The pit is cuboid in shape, with a length of 5 m, a width of 20 dm, and a depth of 36 cm. They excavate 0.4 cubic meters of soil an hour. How much time (hours and minutes) is needed to excavate this pit?
Result
Result
Tips for related online calculators
Do you know the volume and unit volume, and want to convert volume units?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Cross-section 79984
A ditch with a cross-section in the shape of an isosceles trapezoid with bases of 3 m and 5 m and arms of length 2 m is 2.5 meters deep and 10 meters long. How many cubic meters of soil did they have to excavate when digging it? - Rectangular 67604
The Horniakovs dug a pit for a cesspool in the shape of a cuboid with bottom dimensions of 40*40 dm and a depth of 350 cm. A) How many cubic meters of soil did they dig up? B) The excavated soil was evenly spread and pressed onto a rectangular area measur - Excavate 3008
The well will have a diameter of 2 m and a depth of 7 m. How many cubic meters of soil are needed to excavate a well? - The well
The well has the shape of a cylinder with a diameter of 2 m. From ground level to water level are 4 meters, and the water depth in the well is 6 m. How many m³ of soil did they dig when digging a well? How many liters of water are in the well?
- Cylinder 5123
The well has the shape of a cylinder with a base diameter of 1.2 m. From the surface to the surface, it is 4 m, and the water depth is 3.5 m. How many m³ of soil had to be dug when digging the well? How much water (in cubic meters - m3) is in t - Truncated 43851
The pit is a regular truncated 4-sided pyramid, with 14 m and 10 m base edges and a depth of 6m. Calculate how much m³ of soil was removed when we dug this pit. - Soil pit
Workers dug a pit cube with an edge of 2.5 meters. How many cars shall remove soil if the car suddenly takes 4 m³ of soil?