The Horniakovs dug a pit for a cesspool in the shape of a cuboid with bottom dimensions of 40*40 dm and a depth of 350 cm.
A) How many cubic meters of soil did they dig up?
B) The excavated soil was evenly spread and pressed onto a rectangular area measuring 20*8m. How many centimeters is the height of the resulting layer?
A) How many cubic meters of soil did they dig up?
B) The excavated soil was evenly spread and pressed onto a rectangular area measuring 20*8m. How many centimeters is the height of the resulting layer?
Correct answer:
Tips for related online calculators
Do you want to convert area units?
Do you know the volume and unit volume, and want to convert volume units?
Do you know the volume and unit volume, and want to convert volume units?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
Related math problems and questions:
- Constructing 67634
During the construction of a 140-meter-long gas pipeline, a pit with vertical walls 1.5 m deep and 1 m wide must be created. A) How many cubic meters of soil must be dug up? B) We spread the excavated soil evenly on a field with dimensions of 70 m and 120 - Digging
A pit is dug in the shape of a cuboid with dimensions 10mX8mX3m. The earth taken out is spread evenly on a rectangular plot of land with dimensions of 40m X 30m. What is the increase in the level of the plot? - Workers
Workers are digging a jump pit in the schoolyard. The pit is cuboid in shape, with a length of 5 m, a width of 20 dm, and a depth of 36 cm. They excavate 0.4 cubic meters of soil an hour. How much time (hours and minutes) is needed to excavate this pit? - The well
The well has the shape of a cylinder with a diameter of 2 m. From ground level to water level are 4 meters, and the water depth in the well is 6 m. How many m³ of soil did they dig when digging a well? How many liters of water are in the well?
- Quadrilateral 81975
The lime pit has the shape of a quadrilateral prism with dimensions of 2m, 1.8m, and 1.5m Calculate the pile volume from the excavated soil, which, due to fluffing, is 20% larger than the volume of the pit. - Truncated 43851
The pit is a regular truncated 4-sided pyramid, with 14 m and 10 m base edges and a depth of 6m. Calculate how much m³ of soil was removed when we dug this pit. - Hole
They fill the shape hole with dimensions 2.7 m, 20 m, 15.8 m with 282 m³ of soil. How much percent does it fill up?