Two looms
On two looms of different performances, the desired amount of fabric can be woven in 6 hours when both are working simultaneously. On the first machine, this amount of fabric would be woven in 10 hours. How long would it take to weave on the second machine?
Correct answer:

Tips for related online calculators
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
algebraUnits of physical quantitiesthemes, topicsGrade of the word problem
Related math problems and questions:
- Because of
Due to the large potato harvest this year, the farm bought a new, more powerful sorter in addition to the old one. Now both machines work simultaneously, and therefore the daily harvest is processed in 12 hours. If only the old machine were working, it wo
- Calculated 3465
The master calculated that six looms would weave the ordered fabric in 15 hours. One condition appeared. How long before the ordered substance matches the remaining states?
- Sprayers
The vineyard can be sprayed first sprayer in 2 hours and with the second in 4 hours. How long would it take if we used sprayers both at once?
- Tractors 19713
Two tractors are working on plowing the field. If only the first tractor plowed, it would plow the field in 3 hours. The second tractor would plow the field by itself in 6 hours. How long will it take to plow if they work together, but the other starts wo
- Simultaneously 6272
The first inflow fills the tank in 4 hours and the second tributary in 6 hours. How long will it take to fill both tributaries simultaneously, but the species will start an hour later?
- Soda bottles factory
Two different filling machines fill soda bottles to order. If the first machine worked alone, it would need a third less time to complete the order. How long would it take each machine to complete the job independently if the faster machine worked for 96
- Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi