Woodcutter 39491
A bark beetle attacked part of the forest. The first woodcutter would need ten shifts to clear the forest, the second 6 shifts, and the third five shifts. Calculate how many shifts the forest will take if they work together.
Correct answer:
Tips for related online calculators
Do you have a linear equation or system of equations and looking for its solution? Or do you have a quadratic equation?
Do you want to convert time units like minutes to seconds?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Themes, topics:
Grade of the word problem:
Related math problems and questions:
- Together 82970
The first tiler would tile the pool inside in 5 working hours; the second would need 7 working hours for the same job. How long would it take them to tile the pool inside together if the second tiler starts working on the pool 12 minutes later than the fi - Boots
Master shoemaker has three apprentices. First, do one pair of boots for two days, second for one day, and third for 1.5 days. How long would it take to make a couple of boots if they worked together? - Digging
The first worker would dig a trench in 6 hours. For the second, the same work would take 4 hours. How long did it take for the trench to be dug if they worked together? - Tractors 19713
Two tractors are working on plowing the field. If only the first tractor plowed, it would plow the field in 3 hours. The second tractor would plow the field by itself in 6 hours. How long will it take to plow if they work together, but the other starts wo - Together 8086
The first tiler would cover the inside of the pool in 5 working days, and the second would need seven working days for the same work. In how many days would they line the inside of the pool together? - Three people
Three people start doing work at the same time. The first worked only 2 hours, and the second finished 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, the second 12 hours, and the third 15 hours. How m - Three painters
The three painters have painted bridges. The first would work done in 5 days, the second in 6 days, and the third in 7.5 days. How long will the bridge work if they work together? - Together 39671
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together? - Working together on project
Two employees did working on the project. First, make it alone for 20 days, the second for 24 days. How many days will it take to complete the project if five days they work together, then first will take two days holiday, and after returning they complet - Two workers
One worker makes a part 4 hours and the second 9 hours later than they would make the same part together. How long does it take for each worker to make the part himself? - Two companies
The family ordered two companies to modify the garden. The first would be done in 20 days; the second would take 40% less time. How long will they work together if the second company started working when the first worked for four days? - Installed 5793
A group of fitters installed the cable line in 9 changes, and the second group completed the same task in 1/3 less time. How many shifts would the third group do the same work if, with all three groups working together, the assembly took 2 shifts? - Work together
Two bricklayers are plastering a wall. The first would plaster it in 8 hours, the second in 12 hours. How many hours will they be done with the work if they work together? - Together 5931
The tank will be filled with the first inlet in 5 hours and the second in 12 hours. How long would it take to fill the tank together? - Basement 81681
After the flood, the Nováks would pump water out of the basement with one pump in 120 minutes, the second in 300 minutes, and the third in 600 minutes. How many minutes will it take them to pump the water out of the basement if they use all the pumps at o - Complete 23811
We ordered two parties of workers to replace the windows and doors. The first group would complete the task in 15 days. The second in ten days. How many days will they be able to exchange it together? - Treatment 46571
They have 3 sprayers for the chemical treatment of the vines. The first would spray the vineyard in 12 hours, the second in 15 hours, and the third in 10 hours. How long would it take to spray the vineyard with all the sprayers combined?