Washer
The washing machine drum washes at 64 RPM. The washing machine motor pulley has a diameter of 6 cm. What must be the diameter of the drum machine pulley when the motor is at 367 RPM?
Correct answer:

Tips for related online calculators
Check out our ratio calculator.
Do you want to convert length units?
Do you want to convert velocity (speed) units?
Do you want to convert length units?
Do you want to convert velocity (speed) units?
You need to know the following knowledge to solve this word math problem:
planimetricsbasic operations and conceptsUnits of physical quantitiesGrade of the word problem
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- Engine pulley
The engine has a 1460 rev/min (RPM). The disc diameter is 350 mm. What will be the peripheral disc speed in RPM? Pulleys on the engine have a diameter of 80mm, and a disc has a diameter of 160mm.
- Diameter of a drum
Winding drum length 180mm, initial diameter 60mm. Using a 6mm rope with a length of 50m, what will be the diameter of the wound drum with the rope?
- Corresponding 33321
The following data on the height and the corresponding number of pupils were found in the measurement of 63 pupils: the height; number of pupils 159cm; 1 161cm; 1 162cm; 2 163cm; 1 164cm; 2 165cm; 2 166cm; 3 167cm; 2 168cm; 4 169cm; 3 170cm; 5 171cm; 6 17
- KiloJoules energy
In the washing machine, 6 liters of water were heated from a temperature of 22 degrees to 62 degrees. Find out the weight of 6 liters of water. What heat (in kJ= kiloJoules) did the water receive?
- Icerink
A rectangular rink with 68.7 m and 561 dm dimensions must be covered with a layer of ice 4.2 cm thick. How many liters of water is necessary for ice formation when the ice volume is 9.7% greater than the volume of water?
- Winch
The steel rope has a diameter of 6mm and a length of 20m. We are winding it on a drum width of 60 mm, with a starting diameter of 50 mm. What is the final diameter after winding?
- Machine particles
Since the start of the shift, 1,260 parts have already been produced on the press. This fulfilled 3/7 (three sevenths) of the daily plan. How many parts does the press still have to produce when the plan is to be fulfilled at 105%?