Efficient 43461
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 days.
Correct answer:

Tips for related online calculators
Check out our ratio calculator.
You need to know the following knowledge to solve this word math problem:
basic operations and conceptsthemes, topicsGrade of the word problem
Related math problems and questions:
- Part-timers 6344
Certain work was to be done by 21 workers during an eight-hour workday, due in 12 days. After five days, temporary workers came to their aid. They all worked together for 7 hours a day and finished the job in 6 days. How many part-timers were there?
- Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall?
- They exceeded
In mines A and B, they were supposed to extract 20,000 tons of coal together. However, they exceeded their joint plan and so they extracted 133 tons more together. In mine A, they exceeded the plan by 2 percent, and in mine B, on the contrary, they extrac
- Painters 5
Six painters were supposed to paint 6000 m² of area within the planned time. Two painters got sick, so each of the four who remained had to paint 50 m² more each day than the planned daily output. Calculate the original planned daily output of one painter
- Agricultural 65594
Six identical harvesters were supposed to work on the harvest for 12 days in the agricultural cooperative. After three days, however, two harvesters left for another team. Find how long the harvest time in the farm cooperative has increased.
- Initially 35123
Five hundred ninety pieces of clothing were to be sewn in the two branches of the tailor's workshop. However, 30% more were sewn in the first workshop and 10% more in the second. They sewed a total of 703 pieces. How many products were initially supposed
- Efficiently 65484
In the first workshop, there are 3 workers; in the second workshop, 2 work equally efficiently. They worked on the order together, and for the last 2 days, only workers from the first workshop. If only the first workshop were working, the order would be c