Number of problems found: 5880
- Gardeners 5542
Three gardeners mow the meadow for a while. Four gardeners can do it half an hour earlier. How long will it take five gardeners to do it? - Finished 5279
Štěpán is planting trees. If he had planted 12 trees every hour instead of 9 trees, he would have finished 1 hour earlier. How many stems should he plant? - Workers 4949
The three workers will dig one big pit in two days. How many workers would dig seven large pits in three days? - Solution 3092
How many liters of 80% alcohol need to be mixed with 4 liters of 40% alcohol to get 70% alcohol? How many liters of 70% solution do we get? - Alaska vs Montana
Alaska is the largest state in the United States and has a surface area of approximately 588,000 square miles. Montana has a surface area of approximately 25% of the surface area of Alaska. What is the approximate surface area of Montana? - Alcohol solutions
We have to produce 2 liters of 60% alcohol from 55% and 80%. How many of which ones will we use in the solution? - A 36
A 36 g sample of the substance contains 91% water. After drying, the weight of the sample was reduced to 18 g. What percentage of water is now in the sample? - Coins
The money - coins are minted from the hardest bronze, which contains copper and tin in a ratio of 41:9. How much copper and tin are in 2kg of bronze money? - Mushrooms
Fresh mushrooms contain 88% water and dried 14% water. How many kilograms of fresh mushrooms should be collected to get 3 kg of dried? - Bicycle gear
The pedal bicycle wheel has 56 teeth and a rear 20 gear tooth. How many times does the bicycle wheel turn when you make 20 turns of the pedal wheel? - Painters
Five painters painted the fence for eight days. How many days over will it take to work if they paint the fence with only four decorators? - Banknotes
$ 1390 was collected. How much was in $20 notes, and how many in $50 notes in that order? How many solutions exist? - Mukls
The six workers' working group would order jobs completed within 21 working days. How many workers must be added to complete a contract in 14 working days? - Tablecloth
I embroider a tablecloth in 20 days, but if I embroider for 3/4 hours a day, I have embroidered it for 15 days. How long do I embroider a day? - Christmas Day
In leap years was 53 Sundays. On what day of the week fell Christmas Day? - Three digits number
How many are three-digit integers such that they have no digit repeats? - Event probability
The probability of event N in 5 independent experiments is 0.4. What is the probability that the event N occurs in one experiment (chance is the same)? - Investment of the year
At the beginning of the year, my father invested EUR 1,000 in the bank at an annual interest rate of 3%. How many euros will the bank credit him with the deposit after eight months? (compound interest - from financial mathematics) - Excavation
Mr. Vendelín calculated that excavation for a water connection digs for 10 days. His friend would take 10 days. Vendelín worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of the excavation they - Trolleybus
Trolleybus line No. 206 measured 24 km. If the trolley bus goes faster by 5 km/h, the way there and back would be shorter by 33 minutes. Calculate the trolley bus speed and the time it takes for a return trip.
Do you have homework that you need help solving? Ask a question, and we will try to solve it.