- Adjusting 72554
Two working groups are adjusting the park. The first group would do the work in 15 days, and the second in 25 days. How many days will they do the work together? - Swimming pool 6
We open the first pipe, and then after two hours, we open the second pipe without closing the first. The swimming pool will be filled with both pipes in 4 hours. If we open the first pipe itself, it will fill the pool 1.5 times faster than the second pipe - Buckets 71944
The bucket is filled with one tap in 4 minutes and the other in 3 minutes. In how many hours will five buckets be filled with both cocks? - Construction 71794
Two different trucks together would bring the construction material in 6 hours. However, after 4 hours, the first car was transferred to another job, and the second one was driven for another 6 hours. How many hours would it take for the first car to deli
- Apartment 71114
A father and son paint the apartment together in 6 hours. My father would paint the apartment in 9 hours. In how many hours would the son paint the apartment himself? - Tributaries 70734
The pool would fill with three identical tributaries in 52 hours. After 20 hours, two more inlets were added. How many hours did the pool fill up? - Improvements 70344
Two workers work equally efficiently and together can complete a given task in 5 hours. One worker improved his machine, changed his workflow, and increased his output by 40%. How long will it take both workers to complete the given task? - Grandmother's 69254
The grandmother and granddaughter Julia harvest currants in 15 hours of work together. Julia would harvest currants for ten days after 6 hours of work a day. a) Determine in hours how long the harvest would have taken for her grandmother if Julča had not - Hectares 68854
Tractor drivers plow "h" hectares of land per day. How many hectares of land would they have to plow per day to plow the 585 ha area three days earlier than planned? For which "h" does this problem have a positive solution?
- Performance 66764
Six masons of equal performance were able to plaster the walls of the new garages in 18 shifts. After 4 shifts of joint plastering, 2 got sick. a) In how many more shifts did the masons complete the said plastering? b) In how many shifts was the assigned - Terminated 66674
The department store originally employed 8 cleaners for reduced working hours of 4 hours a day. When two of them terminated their employment, 6 cleaners agreed to extend their original daily working hours. Specify its length in hours and minutes. - Agricultural 65594
Six identical harvesters were supposed to work on the harvest for 12 days in the agricultural cooperative. After three days, however, two harvesters left for another team. Find how long the harvest time in the farm cooperative has increased. - Efficiently 65484
In the first workshop, there are 3 workers; in the second workshop, 2 work equally efficiently. They worked on the order together, and for the last 2 days, only workers from the first workshop. If only the first workshop were working, the order would be c - Individually 65314
A bakery worker makes 300 rolls more than an apprentice in 2 hours. In 4 hours, they both made 9800 rolls together. What are the hourly output of the worker and the apprentice individually?
- Together 65074
Jana washes 20 windows alone in 4 hours. Petra would be able to do it in 6 hours. How long will it take to work together? - Bricklayer 65064
The bricklayer would be able to repair the wall himself in 30 minutes. It would take students an hour to learn. How long will it take for them to work together? - Opened 64544
We can fill the pool with two inflow pipes. The first pipe fill in 24 hours and the second in 16 hours. How long did the pool fill if the first tube was open for the first 4 hours and then we opened both inlets? - Construction 64524
The bricklayer and the apprentice will build the wall in 6 hours. If the bricklayer worked alone, the wall construction would take him 5 hours shorter than the apprentice. How long before the wall would the bricklayer build himself? - Completed 64134
Six workers will do the work in 8 hours. How many workers must be added if the work is to be completed in 3 hours?