Themes, topics - math word problems - page 101 of 168
Number of problems found: 3346
- Rocket start
The body launched vertically up returns to the start site in 6 seconds. What height did it have? - Raindrops
The train is moving at a speed of 60 km/h. Raindrops falling vertically in the absence of wind (with uniform movement due to the action of air resistance) leave traces on the windows of the train, deviating from the vertical direction by 30°. How fast are - Kilometers 8125
Formula 1 drivers drive on the training circuit. After one-third of the 42 laps, he must go into the pit. How many laps have they covered by then? One circuit measures 15 km. How many kilometers have they traveled, and how many kilometers do they still ha - The work
The work was to be done by 150 workers. At the beginning of their work, The company reduced their number by 40, which increased the work time by 5 and 1/3 of the schedule. How long did the work take? - Walking
The boy walked about 8.5 km in an hour. How long will it take to walk a distance of 32 km if he takes two breaks of 30 minutes during the route? - Three people
Three people start doing work at the same time. The first worked only 2 hours, and the second finished 3 hours before the end. On an individual basis, it would take the first time to do the work 10 hours, the second 12 hours, and the third 15 hours. How m - Athletic competition
In a 400-meter athletic competition, a participant covers the distance given below. Find the average speed. first 80 meters 10 m/s next 240 meters 7.5 m/s last 80 meters 10 m/s - Determined 8095
Jeníček weighed a broken piece of brick and found that it weighed 48 grams. Using a measuring cylinder, he determined its volume at 30 cm³. What is the density of the brick? - Together 8086
The first tiler would cover the inside of the pool in 5 working days, and the second would need seven working days for the same work. In how many days would they line the inside of the pool together? - Minutes 8081
I will drain the whole tub in 4 minutes. How long would it take to drain it if I added two more drain holes? - Distance 8080
The driver covered the distance between the two cities in 2 hours at an average 75 km/h speed. How did he change speed to get 20 minutes faster? - Four workers
Four workers lay on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take for the remaining three workers to complete their work? - Twenty-four 8069
Twenty-four combers combed the hop garden in 6.5 days. How many combers would have to work on combing the hop garden in 5 days? - Two cars on ring
Two cars were on the round track (ring) in the adjacent tracks, the first on the inner track and the second on the outer track. Both cars started at the same time from one starting track. The first toy car drove four laps simultaneously, and the second to - Luggage and air travel
Two friends traveling by plane had a total of 35 kg of luggage. They paid one 72 CZK and the second 108 CZK for being overweight. If only one paid for all the bags, it would cost 300 CZK. What weight of baggage did each of them have? How many kilograms of - Tributaries 8056
The pool is filled with three identical tributaries in 12 hours. In how many hours will only two tributaries fill it? - People 8055
In 12 days, ten people will dig a 3km cable car. In how many days will five people dig it up? - Eight hours
Brigadier Franta ties a sheaf of hay in 20 minutes. Lujza, at the same time, only a quarter. How many sheaves will they tie together in 8 hours? - Lumberjacks
Fifteen lumberjacks would take 12 days to destroy the broken trees. How many days would this work require if the company added five workers to it after four days? - Calories 2
Ben eats approximately 2400 calories per day. His wife Sarah eats 5/8 as much. How many calories does Sarah eat per day?
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.
