- Office Carpet and Rails
The worker bought a new carpet with moldings for the square office. The rails for this office cost CZK 1,500; 15 CZK per 1 m. How many m² does this office, in which six people work? - Wheat harvest
One combine harvester harvests a wheat field in 12 hours, and another combine harvester in 16 hours. How long does the same field harvest the third combine harvester alone if all three harvesters harvest the wheat field in 2 hours? - Sick
Six seamstresses should make 60 shirts in five business days. After three days, two seamstresses were sick. How many days will the remaining seamstresses need to finish the contract? - Three workshops
2743 people are working in three workshops. In the second workshop, 140 people were more than in the first, and in the third work, 4.2 times more than in the second. How many people work in each workshop? - Together
Grandfather, father, and son are carpenters. They decided to make a wardrobe. Father produces it for 12 hours, his son for 15 hours, and grandfather for 10 hours. How long will they make it together? - In and out
The empty tank is filled in 12 minutes and empty in 16 minutes. If we forget to close the drain, how long does it take to fill? The tank has 1000 liters of volume. - Tractors
Two tractors plow the field for 4 hours together. If the first tractor plowed half of the field and then the second tractor completed the job, it would take 9 hours. How many hours does the field plow for each tractor separately? - Three Groups Work Shifts
A group of fitters installed the cable line in 9 changes, and the second group completed the same task in 1/3 less time. How many shifts would the third group do the same work if, with all three groups working together, the assembly took 2 shifts? - Socík
On the construction site of a new housing estate in Kladno-Kročehlavy, students from the state labour reserve carried out machine plastering of the masonry. 5 students using machines plastered 10 square metres more masonry than 6 plasterers working by han - Work
The first worker would need less than 4 hours to complete the task than the other worker. In fact, both workers worked for two hours together. Then, the first worker did the remaining work himself. In what proportion should the remuneration of the workers - Highway tunnel
The company built the highway tunnel from two ends in the north-south direction. The average daily performance of the "northern party" rasters was higher than the average daily power of the "southern party" rasters. After 55 business days, both parties me - University students
One company employed a university student on a farm for the entire month of June by paying him €16 and a full board for one day. If he did not work that day, he had to pay €6 for the meal. How many days did the student work if he earned €348 in the month - Two workers
Two workers should fulfill specific tasks together for five days. If the first worker increased their performance twice and the second twice fell, it took them just four days. For how many days would he handle the entire task, the first worker himself? - Two Workers Work Days
Two workers would do the work together in 2 days. The first would do some work here in 6 days. In how many days would the second worker do this work? - Kinetic Energy Braking Force
Johnny is skating at a speed of 18 km/h. His kinetic energy is 0.5 kJ. Johnny weighs 40 kg. Calculate: 1. What work will the braking forces do before Johnny stops? 2. What is the braking force if Johnny stops after covering a distance of 14 m? - Task calculation
Jane had to calculate 70 tasks, and if she had solved two more daily tasks than she had planned, she would have finished four days earlier. How many days did she have to calculate the tasks? - Spruce planting
Mrs. Brown planted 50 spruce trees in three and a half hours in the morning. Mrs. Clark came in the afternoon, and together they planted another 100 spruce trees in four and a half hours. Find: A. How long would it take Mrs. Clark to plant 50 spruce trees - Material improvement
Material in a factory was originally enough for two workshops for 20 days. After implementing an efficiency improvement, the same material lasted 25 days. How many days will the material last for 5 workshops now? How many extra days of work do the saved m - Third pump
The first pump fills the pool in 12 hours. The second pump fills it in 15 hours. If all three pumps work, the pool will fill in 4 hours. How long will it take to fill the pool with only the third pump? - Work completion
The two workers dug together for 6 hours. The first worker would do the work himself in 14 hours. How long would it take for the second worker to complete the task?
Do you have unsolved math question and you need help? Ask a question, and we will try to solve it. We solve math question.