Work word problems - last page
Work Problems are word problems that involve different people doing work together but at different rates. Another problem involves pipes filling up a tank. Another name for these problems is working together word problems.We suggest solving working together word problems with the proportion. If we can complete a task in t hours, we can complete 1/t of the task in one hour.
Number of problems found: 800
- Road repair
Road repair took 19 days for 35 workers if they worked 9 hours a day. How many days take repair the same road 26 workers if they work 10 per day? - Workers
Two workers, A and B, will be done work together for 15 days. They worked together for 13.5 days. Then A worker became ill, and worker B finished the job alone for 7.5 days. If every worker was working alone, how many days took the whole work for workers - Madams
During the spring cleaning, ladies were going to wash the windows. Mother takes to wash all the windows 5 hours, the grandmother takes 3 times longer, and Paula washes all windows in 2 hours. How many hours will you spend washing the windows of this "wome - Tanker
The first pump can empty an oil tanker in 4.9 hour. The second pump can empty a tanker in 8 hours. If the first pump started at 4:00 and the second 1.4 hour later, at what time will the tanker be empty?
- Trio
A trio of workers earns 750 euros. Money is divided by the work that each of them makes. The first received twice the second, and the second received three times more than the third. How many got everyone's workers? - Workers
Two workers would fulfill a certain task when working together for 10 days, the first if he worked himself done work in 17 days. How many days will the second worker do the whole job? - Drinking water
A man drinks a keg of water in 36 days, and a woman drinks in 65 days. How many days do they consume a keg together? - Forestry workers
41 laborers have employed planted trees in the forest. For 7 hour work, a day would end job in 32 days. After 12 days, 7 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 8 hours a day? - Excavation
Mr. Vendelín calculated that excavation for a water connection digs for 10 days. His friend would take 10 days. Vendelín worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of the excavation they
- Pediatrician
Pediatrician, this month of 24 working days takes 6 days holidays. What is the probability that on Monday it will be at work? - Work
The first paver paves pavement for 27 hours. Second for 27 hours. I started the first paver and, after 4 hours, joined the second. How long will they finish the pavement? - Work
Workers work five days a week and have 28 days of vacation a year. Calculate how many days is out of work and express it as a percentage. Consider that a year has 52 weeks. - Pool
If water flows into the pool by two inlets, fill the whole for 20 hours. The first inlet filled the pool 8 hour longer than the second. How long does the pool take to fill with two inlets separately? - Bureau of Labor
Bureau of Labor is a state institution that provides mike and the rest for their so-called clients. The mission of the Bureau of Labor is to spend taxpayer money to provide relaxation and benefits to those who do not want to work. Popularly speaking, the
- Pumps
The tank is filled with two pumps in 16 minutes. The first pump is filled in 30 minutes earlier than the second one. How many minutes is filled with the first pump? - Pipes
The water pipe has a cross-section 1184 cm². An hour has passed 743 m³ of water. How much water flows through the pipe with cross-section 300 cm² per 6 hours if water flows at the same speed? - Railways - golden parachutes
As often happens in Slovakia habit, the state's financial institution takes from poverty, and gorillas give. A hardworking punishing taxes. Let's look at a short work of director Railway Company ZSSK - Mgr. P. K. : 18 months 'work' as director reduction a - Tractors
Fields go plow two tractors with various performances. The first tractor plows the whole field in 11 hours. The second tractor plows the whole field 19 hours longer. How long does it take to plow the whole field with two tractors? - Lunch for free
Gastro tickets are "free," so it should retain them. Goods for free approve by many employees in Slovakia. Such as a free gastro ticket per day work. The company issuing gastro tickets gets a 4.9% fee of the total amount of money for tickets. Calculate ho