Tractors

6 tractors started plowing the field that they together take 12 days.

Agronomist hesitates to

A) after 2 days to withdraw 2 tractors, or
B) after 3 days to withdraw 3 tractors.

Help him which of these two cases will be plowing done sooner.

Result




Step-by-step explanation:

v=1612=172  62172+4A172=1 12+4A=72 A=60/4=15 d  63172+3B172=1 18+3B=72 B=54/3=18 d  A<B   



We will be pleased if You send us any improvements to this math problem. Thank you!






avatar




Tips to related online calculators
Need help to calculate sum, simplify or multiply fractions? Try our fraction calculator.

You need to know the following knowledge to solve this word math problem:

Related math problems and questions:

  • Tractors
    tractor Six tractors plowing the field for 8 days. After two days, two tractors broke down. How many days were prolonged work in the field?
  • Five tractors
    tractor Five tractors plow the field in 4.8 hours. How long will it take to plow this field if after 1.5 hours of work, two tractors went to a different field?
  • Tractors
    tractors Fields go plow two tractors with various performances. The first tractor plows the whole field in 11 hours, the second tractor plows the whole field 19 hours longer. How long take plow the whole field with two tractors?
  • Tractors
    tractors 5 tractors will plow the field for 8 hours. In 2 hours, 1 tractor broke down. How long do the remaining tractors complete the plow?
  • Seven tractors
    koleso Seven tractor plowed 308 ha field in four days. How many hectares of fields will plowe 9 tractors in 3 days at the same power?
  • Tractors
    tractor Two tractors plow the field in 4 hours together. If the first tractor plow half of the field and then the second tractor completed the job, it would take 9 hours. How many hours does the field plow for each tractor separately?
  • Five tractors
    tractors Five tractors plow the fields in 4.8 hours. How long will it take to plow the field when, after an hour and a half of work, two tractor drivers have been called up for another task?
  • Excavation
    vykop_ryha Mr. Billy calculated that excavation for a water connection digs for 12 days. His friend would take 10 days. Billy worked 3 days alone. Then his friend came to help and started on the other end. On what day since the beginning of the excavation they met?
  • The field
    tractors 3 tractors plow the field in 6 hours. However, after 2 hours, 1 tractor broke down. How long will the field be plowed?
  • Two workers
    Frog Two workers together execute some work in 10 days. The first worker would have done himself in 20 days. How many days would have done himself a second worker?
  • Forestry workers
    forestry_workers In the forest is employed 56 laborers planting trees in nurseries. For 8 hour work day would end job in 37 days. After 16 days, 9 laborers go forth? How many days are needed to complete planting trees in nurseries by others if they work 10 hours a day?
  • Water reservoir
    nadrz The water reservoir is filled with one pump for 4 days by the second one for 9 days. Outlet can drain tank in 12 days. How long take fill the reservoir if both pumps are running and not closed outlet channel.
  • Two workers
    workers Two workers will do certain work for 12 days. After 8 days of working, was one removed, and then the other finished the job alone in 10 days. For how many days would do this work alone for each worker?
  • Cows
    cow 4 cows spent 16 bags of hay in 5 days. How many bags of hay sacks are needed for 5 cows for seven days?
  • Work at plant
    workers Handyman has vowed to do repair work at the plant for 25 days. However, work had to be shortened and therefore gained helper. Together they made all the corrections for 13 1/3 days. How long the work would take helper himself?
  • Tractors
    tractor Wheel and belt tractors each day plow 8 ha of fields. For plow 76 hectares, the wheel would have to work for 12 days and 8 days with the belt tractor together. How many hectares do each day of each tractor?
  • Two companies
    calendar The family ordered two companies to modify the garden. The first would be done in 20 days, the second would take 40% less time. How long will they work together if the second company started working when the first worked for 4 days?