Bricklayers

When a bricklayer works himself to redeem the house in 8 days, the other bricklayer will be finished in 10 days. How long will it take to make 3 such houses together?

Result

x =  13.333 d

Solution:

Solution in text x =







Leave us a comment of example and its solution (i.e. if it is still somewhat unclear...):

Showing 0 comments:
1st comment
Be the first to comment!
avatar




To solve this example are needed these knowledge from mathematics:

Looking for a statistical calculator? Looking for help with calculating harmonic mean?

Next similar examples:

  1. Pumping
    pumps_1 The tank is filled with a larger pump in 12 hours and with scond pump in 15 hours. For how long does the tank fill when both pumps are switched on at the same time?
  2. Painters 4
    painter_3 One painter will do the job for 12 days. After a 4 1/3 day he comes second to help him and complete work together for 8 days. How long would work the second painter himself?
  3. Painters
    painter First painter painted fence himself for 9 hours, the second painter 1.6 hours sooner than first, and the third painters slowest up to 20 hours. How long took them paint fence if worked together?
  4. Turners
    workers_25 Two turners perform joint work in 3 hours. The first turner would perform the job himself in 7 hours. How long would the same job last for a second turner if he worked alone?
  5. Apprentice
    ucen Worker and apprentice execute the work for 6 hours. Worker performs himself in 10 hours. How long do the work of an apprentice?
  6. Digging companies
    companies Company A would dig a pit for 12 days, company B for 15 days, company C for 20 days and the company D for 24 days. Work began together companies C and D, but after three days joined them other two companies. How long took to dig a pit?
  7. The tank
    pipe2_4 The tank had 9 inflows to be filled in 21 days. After 9 days, 3 trips out. How many days did the remaining 6 tributaries fill the tank?
  8. 15 teachers
    skola_13 15 teachers teach for a combined amount of 128 days over a period of 64 days. What is this expressed as a percentage?
  9. Two diggers
    two-diggers There are two diggers. One digger digs a pit 46 hours second gidding 2 times faster. a) how long took to dig a pit second digger b) how long took dig together
  10. Minute average
    workers_40 In a factory, four workers are assigned to complete an order received for dispatching 1400 boxes of a particular commodity. Worker A takes 4 mins per box, Worker B takes 6 minutes per box, C takes 10 mins per box, D takes 15 mins per box. Find the average.
  11. Tonic
    krem One package tonic consume Mom 12 weeks and daughter for 14 weeks. 4 weeks they use the same cream together and then only daughter. How many weeks endured tonic to daughter then?
  12. 5 pumps
    pump Five pump to pump 3 hours 1600 hl of water. How long pumped same amount of water 4 pumps?
  13. 4 pipes
    roury The tank flows out by 4 pipes in 6 hours 120 hl water. How much water flows out of 5 pipes of the same diameter in 14 hours?
  14. Trucks
    truck_big Truck take you the some amount of clay in 30 hours. Second truck in 40 hours. Trucks carted the clay away some time together then the second truck broke down and the first one completed the job in five hours. What time worked together?
  15. Workers
    okno2_1 Group of workers washing half of the windows of the building in two hours. How long will take half the workers wash all the windows of the building?
  16. Blueberries
    boruvky Marie earns 3 liters of blueberries for 3.4 hours, Peter 2.4 liters for 2.9 hours. How long have earns together one liter?
  17. Two pumps
    pumps_4 Pump A takes twice as long to fill a tank than B . Together they take 2 hours to fill the tank. How long does each one take to fill the tank by itself?