A construction 2
A construction company will be penalized for its bridge construction delays. The penalty is set at 4,000 for the first day and shall be subjected to a 1,000 increase for each succeeding day. The company can afford a maximum payment of 165,000 for a penalty. Find the maximum number of days by which the completion of work can be delayed.
Final Answer:

Tips for related online calculators
Are you looking for help with calculating roots of a quadratic equation?
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
Need help calculating a sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for a solution? Or do you have a quadratic equation?
You need to know the following knowledge to solve this word math problem:
algebraarithmeticnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Construction work
A group of masons had to finish the rough construction within three days. On the first day, they completed a third of this task, but on the second day, they were delayed and did 15% less work than the first day. By what % relative to the second day must t - Plant order completion
Race A can fulfill the order in 12 days, and race B can fulfill the same order in 18 days. If both plants work together, how many days will the order be fulfilled? - Collective irresponsibility
On the Internet, time is very uncomfortable for the state that no more gaffes or waste is no longer possible to hush up as if people were at home with only two television channels censored. An example of the effectiveness of the state can be Bridge at Kom - Workshop order completion
The plant has to complete the order in 40 working days. Production takes place in two workshops. In the first one, there are more workers; therefore, they would complete the order themselves in 70 working days. In the second workshop, they would complete - Invoice penalty
The company paid a total of CZK 38,152, including penalties, for the late payment of the invoice. The penalty was 4 ‰. a) how much was the invoiced amount (without penalty)? b) how big was the penalty? - Factory order completion
Factory A can fulfill the order independently in 10 days. Factory B fulfills the same order in 16 days. How many days will the order be completed if only plant B works on it for 3 days and then both plants together? - Railway repair extension
The railway company planned the repair of the railway tracks for 15 days. Only some employees showed up for work due to the coronavirus, and they extended the repair to 24 days. By what percentage did the repair time increase?