A construction 2
A construction company will be penalized for its bridge construction delays. The penalty is set at 4,000 for the first day and shall be subjected to a 1,000 increase for each succeeding day. The company can afford a maximum payment of 165,000 for a penalty. Find the maximum number of days by which the completion of work can be delayed.
Correct answer:

Tips for related online calculators
Are you looking for help with calculating roots of a quadratic equation?
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
Need help calculating sum, simplifying, or multiplying fractions? Try our fraction calculator.
Do you have a linear equation or system of equations and are looking for its solution? Or do you have a quadratic equation?
You need to know the following knowledge to solve this word math problem:
algebraarithmeticnumbersUnits of physical quantitiesGrade of the word problem
Related math problems and questions:
- Construction 1639
A group of masons had to finish the rough construction within three days. On the first day, they completed a third of this task, but on the second day, they were delayed and did 15% less work than the first day. By what % relative to the second day must t
- Two companies
Company A can fulfill the order in 12 days, and company B can fulfill the same order in 18 days. If only company A works on the order for the first two days and then both companies work on it for the remaining days, how many days will the order be fulfill
- Penalty daily
John was to pay CZK 1,500. If he does not pay on time, he will be charged a penalty of 0.5 permille of the amount owed for each day of delay. He will remember in 30 days. How much is the penalty?
- Construction of the road
Six trucks are supposed to be transported for 18 days to construct the road dam. After three days, the transport company sent two more cars to the construction site. How long will it take to carry the material?
- Collective irresponsibility
On the Internet, time is very uncomfortable for the state that no more gaffes or waste is no longer possible to hush up as if people were at home with only two television channels censored. An example of the effectiveness of the state can be Bridge at Kom
- Paving 2
It will take a construction company 8 working days to pave the sidewalks on two streets in a city if all 6 pavers work. However, only 4 pavers can complete the job because the other two have been dismissed. How many working days will it take the group of
- Z9–I–1
All nine fields of given shape are to be filled with natural numbers so that: • each of the numbers 2, 4, 6, and 8 is used at least once, • four of the inner square boxes containing the products of the numbers of adjacent cells of the outer square, • in t