Algebra - math word problems - page 247 of 292
Number of problems found: 5829
- Roofers 20413
Three roofers put the roofing on the roof in 8 days. How long will it take to get two more after three days?
- Together 8086
The first tiler would cover the inside of the pool in 5 working days, and the second would need seven working days for the same work. In how many days would they line the inside of the pool together?
- Swimming 7602
At the swimming pool, they use three pumps with the same output to fill the pool and fill the pool in 6 hours. How long does it take for the pool to fill nine pumps?
- Cyclists 5827
Cyclists ran 3/7 of the total length during the race and had 80.5 km to finish. How long is the race?
- Workers 3291
The broad workers will do the job in 22.5 days. How many workers still need to be hired to do the job seven days earlier?
- Cottages
The summer camp has 41 cottages. Each has rooms for three and four. How many of the 140 campers live on three?
- Combinations
How many elements can form six times more combinations of the fourth class than the combination of the second class?
- Variation equation
Solve combinatorics equation: V(2, x+8)=72 V(2,x+8) is variations, second class, from x+8 items.
- Password
The voltage station is day changing the master password, which consists of three letters. The code generation process does not change and is based on the following procedure: The following letters (A) to (I) correspond to different numbers from 1 to 9 if
- Probability 17013
What is the probability that a randomly written two-digit number from number 20 to number 99 will be divisible by 11, the power of number 3, or a prime number?
- A box 5
A cereal box states that a 3/4-cup serving contains 90 calories. How many Calories are in 4 cups of cereal?
- Non-equivalence
Write the function logical disagreement – entire sum (non-equivalence) F = A ⊕ B (EXL –OR) in a different notation and draw a Karnaugh map. Use NAND elements to implement the above function if you only have variables A and B
- Two companies
The two companies did work together for 100 days. The first company would do it in 150 days. How many days would the work take the second company?
- Five people
Five people can finish painting a wall in 4 hours if only two people are available. How many hours do they have to work to finish the same job?
- The train
The train passed the observer in the 20s and passed through a 1500m tunnel in 2 minutes. Calculate the speed (km/h) and train length.
- Grass
Peter and Stano lawn grass for 3 hours 12 minutes. How long would it take for Peter if Stano lawn grasses himself for 384 minutes?
- Welders
The welder does the job for six hours, the second one for 8 hours. How long do the job third welder, if all together can do the job in 2 hours?
- Pumps A and B
Pump A fills the tank for 12 minutes, and pump B for 24 minutes. How long will it take to fill the tank if he is only three minutes work A and then both pumps A and B?
- Invitations
For every 5 minutes, writes Dana had ten invitations, while Anna had 14 invitations. How long will write together 120 invitations?
Do you have unsolved problem that you need help? Ask a question, and we will try to solve it. Solving math problems.