- Between terminals
Between terminals of a 220V resistor. A current of 220mA flows through the resistor. Determine the current that flows through the resistor if we connect it to the terminal of a 24 V voltage source. - Water temperature mixing
The mother prepared half a liter of cold water for the children to drink. It mixed water at 20 °C with 400 ml of cold water at 5 °C. What was the temperature of the prepared drink? - Harvester wheat calculation
Rope wheat harvests seven combine harvesters in 5 days at total capacity. The weather forecast is required to complete the harvest in 4 days. How many combined harvesters had to be used together? - Race Length from Fraction
Cyclists ran 3/7 of the total length during the race and had 80.5 km to finish. How long is the race? - Task calculation
Jana had to calculate 70 tasks, and if she had solved two more daily tasks than she had planned, she would have finished four days earlier. How many days did she have to calculate the tasks? - Work completion
The two workers dug together for 6 hours. The first worker would do the work himself in 14 hours. How long would it take for the second worker to complete the task? - Wind speed
The plane flies at a speed of 240 km/h and flies a route of 396 km in 3 hours 20 minutes there and back - once it flies with the wind, the second time it flies against the wind, which has a constant speed the whole time. What is the wind speed? - Reservoir filling
The water reservoir is filled with one inflow in 30 hours and the other in 40 hours. Both tributaries were opened for some time, then the other tributary closed, and the reservoir filled in 5 hours. How long did the water flow in both tributaries at the s - Variation element increase
If the number of elements increases by two, the number of variations of the second class of these elements created by 38 increases. What is the original number of elements? - Exam average
Jane has to pass ten exams in a year. So far, she has made six and has an average of 2.5. What average must she reach from the remaining tests for her overall average for the year to be 2? - Children average age
The average age of the children in the group is 14 years. There are four times more boys than girls in the group. The average age of the girls in the group is 12 years. What is the average age of boys? - Insulating a house
Five workers are working on insulating a house at such a pace that they could finish the job in 18 days. After three days of work, two workers were called away to another construction site. In how many days will the remaining workers finish the job? - Bus car pursuit
At 7:30 AM, the bus left at a speed of 45 km/h, and at 8:00, a car behind it started at 65 km/h. Where and when did they meet? - Highway construction weeks
The first group of construction workers would build a certain section of highway in 15 weeks, and the second group would make it in 10 weeks. After four weeks of working together, the second group was dismissed, and only the first group continued to work. - Last wagon
A 200 m long train passes through the 700 m long tunnel so that a time of 1 minute elapses from the entry of the locomotive into the tunnel to the exit of the last wagon from the tunnel. Find the speed of the train. - Your Mom
Your Mom can clean your entire house in 3 hours. However, your dad takes 5 hours to clean the house. How long will it take for them to clean the house if they work together? (Write the numerical answer round to the nearest thousandth) - The stadion
John can run around a circular track in 20 seconds and Eddie in 30 seconds. Two seconds after Eddie starts, John starts from the same place in the opposite direction. When will they meet? - Two machines
The first machine can produce parts in 24 hours, and the second can produce parts in 16 hours. The first started working at 6:00 p.m., and the second at 10:00 a.m. At what hour were all the parts made? - Hammer fall height
From what height does a hammer weighing 200 kg fall if its initial potential gravity was 6 kJ? - Three tributaries
It is possible to fill the pool with three tributaries. The first would take 12 hours, the second 15 hours, and the third 20 hours. The day before the summer season began, the manager opened all three tributaries simultaneously. How long did it take to fi