Algebra - math word problems - page 249 of 302
Number of problems found: 6040
- Bricklayers
The first bricklayer would build a wall in 3 days, the second in 4 days. The first bricklayer worked alone for a day, then the second bricklayer came to his aid and finished the work together. How long did it take to build the wall?
- Tractors
Wheel and belt tractors each day plow 8 ha of fields. The wheel tractors would have to work to plow 76 hectares for 12 days. Eight days with the belt tractor together. How many hectares do each day of each tractor?
- Two workers
The first worker would complete the work in 8 hours, the other in 6 hours. After two hours of joint work, the worker left the first worker to a doctor, and the others completed the work themselves. How many hours worked did the other worker himself?
- Walkers
Two walkers simultaneously started against each other from places A and B. After the meeting, both continued to B. The Second walker came to B 2 hours before the first walker. Its speed is 2.7 times the speed of the first pedestrian. How many hours went p
- Interpretation 83015
A cargo boat with a total weight of 4,500t sailed from the river to the sea. Calculate by how many tons it is possible to increase the weight of the cargo on the boat at sea so that the draft remains the same as in the river. The density of river water is
- Produced 3333
How much 55% alcohol do we need to add to 1500 grams of 80% alcohol to produce 60% alcohol? How much is 60% of alcohol produced?
- Textbooks 83010
At 9 a.m., a truck with textbooks left Brno at a speed of 50 km/h; at 9:30 a.m., a passenger car left Brno with another delivery of textbooks at a speed of 70 km/h. When will the passenger car catch up with the truck?
- Passenger 64534
A passenger car drove a highway section at a constant speed. At a speed of 20 km/h higher, the ride would take 6 minutes less. At a speed of 20 km/h lower, it would take 9 minutes more. Calculate the length of the highway section.
- Seamstresses 4635
Eight seamstresses have to complete the order in 16 days. After four days, the two seamstresses switched to another job. In how many days will the order be fulfilled?
- Probability 41091
What is the probability that an odd prime will fall on a dice roll?
- Numbers 3973
The average of the two numbers is 74. One of these numbers is a) 62.5 b) 102 specify the second number
- Liters 83211
We have 160 L of water at 67°C; how many liters of cold water at 18°C are needed to cool it to 39°C?
- Insulating a house
Five workers are working on insulating a house at such a pace that they could finish the job in 18 days. After three days of work, two workers were called away to another construction site. In how many days will the remaining workers finish the job?
- Four painters
The company sent four painters to paint the school. They should be done in 12 days. After three days, one painter got ill. How long will the remaining painters paint the school?
- Granules
Katy had two dogs. The first one ate a pack of granules a week, and the other two times longer. Katka bought them two bags of granules. How long does it last for both dogs?
- Milk mixing
You have 12 liters of milk with a temperature of 20°C. How much milk at 80°C do you have to add to have milk at 30°C?
- Workers
Four workers plan to work on the gym floor for six hours. After an hour of working together, one of the workers went to the doctor. How long will it take the remaining three workers to finish the job?
- Bricklayers
Eight bricklayers build a house for 630 days. How many bricklayers must be added after 150 days to complete the building in (next) 320 days?
- Crown
Siblings collect 2-crowns and 5-crowns. Together, have 80 coins with a total value of 310 crowns. How many saved two crowns, and how many five crowns?
- Exponential 8360
Solve the exponential equation: 8 raised to x = 40
Do you have unsolved problem that you need help? Ask a question, and we will try to solve it. Solving math problems.