Mean + system of equations - practice problems - last page
Number of problems found: 54
- Two workers
Two workers work together and perform the job in 12 hours. If one has done half the work and then the second worker next half of the work, it will take 25 hours. How long would it take to job them separately? - Classs mean
The class size is 30 students. Math was not worse than mark 2. Find the number of pupils who were marked one if the class had a 1.4 average mark. - Triangle midpoints
Determine coordinates of triangle ABC vertices if we know triangle sides midpoints SAB [0;3] SBC [1;6] SAC [4;5], its sides AB, BC, AC. - Target
Peter, Martin, and Jirka were a fire in a particular target, with only three fields with values of 12, 18, and 30 points. All boys were firing with the same number of arrows, and all the arrows hit the target, and the results of every two boys differed by
- Pedestrian up-down hill
Pedestrian goes for a walk first at the plane at 4 km/h, then uphill at 3 km/h. Then it is in the middle of the route, turns back, and goes downhill at 6 km/h. The total walk was 6 hours. How many kilometers went pedestrians? - Exam average
The average of marks that have on the certificates students of 8A class in mathematics is exactly 2.45. If we did not add 1 and 3 of students Michael and Alena, who arrived a month ago, it would average exactly 2.5. Determine how many students have class - Bases
The length of the bases trapezium is in ratio 4:5. The length of the midline is 15. How long are the bases of a trapezoid? - Three workers
Three workers, A, B, and C, have to work on a specific task. Workers A and B completed the task in 12 days, B with C for 19 days, and A with C for 24 days. How long would it take to complete the task for everyone alone? How long would it take to complete - Two valves
Water fills the pool with two valves for 11 days. After 7 days, the workers stopped the first and second valve fill pool for 7 days. How many days took to fill the pool of each of the valves individually?
- Certificate
There are 31 students in a class. The mathematics score wasn't worse than 2. The average score in mathematics was 2. How many students have a score of one, and how many have a score of 2? - Angles in a triangle
The angles of the triangle ABC make an arithmetic sequence with the largest angle γ=83°. What sizes have other angles in a triangle? - Workers
Two workers, A and B, will be done work together for 15 days. They worked together for 13.5 days. Then A worker became ill, and worker B finished the job alone for 7.5 days. If every worker was working alone, how many days took the whole work for workers - Team
The football team has 11 players. Their average age is 20 years. During the match, one player withdraws due to injury, and the team's average age is 18. How old was the injured player? - Pool
If water flows into the pool by two inlets, fill the whole for 20 hours. The first inlet filled the pool 8 hour longer than the second. How long does the pool take to fill with two inlets separately?
We apologize, but in this category are not a lot of examples.
Do you have homework that you need help solving? Ask a question, and we will try to solve it.
Do you have homework that you need help solving? Ask a question, and we will try to solve it.