Work - practice for 12 year olds - page 4 of 15
Number of problems found: 298
- Hour salary + fix
Devin recently hired a contractor to do some necessary work. The contractor quoted $395 for parts plus $62 an hour for labor. Let x represent the number of labor hours worked. Write an algebraic expression to represent the total cost of the repairs. - Modifications 48393
During the cross-country ski run modifications, 32 volunteers worked 256 hours. How many hours did an average volunteer work? - Six identical
Six identical compressors inflate 180 balloons in one hour. How many balloons inflate one compressor in 10 minutes? - Three
Three pavers will pave the sidewalk in 4 days. How long does it take for two tiles to pave the same sidewalk?
- Painters 44121
Two painters will paint the bridge in 12 days. How many painters must we employ if we need to paint the bridge in 8 days? - Efficient 43461
Four workers were supposed to build 200m of the fence in 15 days. However, after 3 days, two more workers came to their aid. All workers were equally efficient. Calculate how many meters of the fence (from the original 200m) remained after the first 3 day - All tasks - taskman
Skilled workshop master washes client car 1/5 hour, cleaned the client's car in 5/4 hour, and painted small defects on car 1 1/3 hour. How long did it take him to do all the necessary work tasks? - Michael 42461
Michael will read the book in 8 days if she reads 15 pages daily. How many pages does she have to read per day if she wants to finish the book six days after the start of reading? How many pages does the book have? - Seamstresses 42451
Eight seamstresses will make the order in 15 shifts. How many will be sewists if they have to complete an order three shifts earlier?
- Together 39671
Three workers were to lay the parquet floor. If everyone worked alone, the first would finish the job in 30 hours, the second in 24 hours, and the third in 20 hours. How long will they do the floor if they work together? - 20-meter-long 39603
Two workers will pave a 20-meter-long sidewalk in 5 days. Determine how long it would take to pave the sidewalk: a) 4 workers b) 5 workers c) 10 workers - Carpenter 36293
The carpenter did the work in 3 2/5 hours. What part of the work did he do in an hour? - Two xeroxes
The performances of the two copiers are in the ratio of 3:4. A machine with higher power will make 7,200 copies in one hour. How many copies will both machines make together in 5 hours? - Children's 31961
The pool for swimmers has dimensions of 25m, 10m, and 2.8m, and the children's pool is only 10m, 4m, and 1m. The pump will change all the water in the swimming pool in 9 hours. How long does it take for the same pump to pump out the water in the children'
- Six painters
Six painters paint an area of 120 m² in 4 hours. How long does it take for 12 painters to paint 480 m² with the same performance? - Workers 31841
Twelve workers earned 2,000 euros in 10 days. How many workers would 14 workers earn in 8 days? - Book reading
Susan thought, "If I read 15 pages a day, I will read the whole book in 8 days. "How many pages would she have to read a day if she wanted to finish the book on the 6th day from the start of reading? And how many pages does the book have? - Minutes 31571
The typist typed 16 pages of text in 2 hours and 8 minutes. How many pages of text will you write at the same speed in 20 minutes? - Everyone drinks the same
Twenty-four bricklayers drink 72 beverage bottles a day at the construction site. How many bottles would 19 bricklayers need? Everyone drinks the same.
Do you have homework that you need help solving? Ask a question, and we will try to solve it.