Workers
Workers are digging a jump pit in the schoolyard. The pit has a cuboid shape with a length of 5 m, a width of 20 dm, and a depth of 36 cm. They excavate 0.4 cubic meters of soil an hour. How much time (hours and minutes) is needed to excavate this pit?
Result
Result
Tips for related online calculators
Do you know the volume and unit volume, and want to convert volume units?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
Do you want to convert velocity (speed) units?
Do you want to convert time units like minutes to seconds?
You need to know the following knowledge to solve this word math problem:
Units of physical quantities:
Grade of the word problem:
We encourage you to watch this tutorial video on this math problem: video1
Related math problems and questions:
- What power 2
What power has a pump output to move 4853 hl of water to a height of 31 m for 8 hours? Comparing the power generated by the pump vs. the power generated by the motor, which is more efficient? Which pump or motor generates more pollution if, for every watt - Pump power
Determine the pump power if: I pour 3 m³ of water from the tank in 120 seconds with a hose. The height of the hose mouth above the tank is 1.5 m. The water's speed from the hose outlet is 20 m/s. - Vertically 65984
We threw the stone vertically upwards at a speed of v = 15m. s-1. How long will it be at a) 10 m, b) 12 m? - The car
The car has a consumption of 5 liters per 100 km. It has 24 liters of gasoline in the tank. How much petrol remained in the tank when it rides for two and a half hours at a speed of 80 km/h?
- Water tank
The block-shaped tank is 2.5 m long, 100 cm wide, and 12 dm high. Water flows into the tank at 40 liters per minute. In how many minutes will it be filled with water to two-thirds? - Deceleration
In a braking test, a vehicle that travels at 51 km/h stops in 5 s. What is its acceleration? - Radiators
Calculate the radiator output if it has a thermal gradient (difference between inlet water and return temperatures) a) 5°C b) 10°C c) 15°C d) 20°C A heating water volume flow is 45 kg/h. How fast the water flows from the supply pipe to the radiator e) DN1 - Approximately 30131
Please calculate according to Pascal's law. Calculate the hydrostatic pressure at a depth of 300m below sea level if the density of seawater is approximately 1025kg per m³. At what depth below the surface is the hydrostatic pressure 4.5 MPa? - Compressive 19933
The submarine is at a depth of 50 m below the concave surface of the sea. Find the hydrostatic compressive strength of seawater on a metal cover with an area of 0.6 m².
- A filter
It is a pool with a volume of 3500 liters. The filter filters at 4m cubics per hour. How many minutes would it filter the entire pool? - Two cylinders
Two cylinders are there, one with oil and one with an empty oil cylinder has no fixed value assumed infinitely. We are pumping out the oil into an empty cylinder with a radius =1 cm, height=3 cm, rate of pumping oil is 9 cubic centimeters per sec. We are - Potential 12431
From what height does a hammer weighing 200 kg fall if its initial potential gravity was 6 kJ? - Two water containers
There are 200 m³ of water in the first container, and in the second, 40 m³. The first container will flow down at a rate of 10 m³ water per hour. At the same time flows at the second rate of 5 m³ per hour. After how many hours will there be three times le - Temperature 7477
The pool with a length of l = 50 m and a width of s = 15 m has a depth of h1 = 1.2 m at the shallowest part of the wall. The depth then gradually increases to a depth of h2 = 1.5 m in the middle of the pool. = 4.5 m walls in the deepest part of the pool.
- Orlík hydroelectric plant
The Orlík hydroelectric power plant, built in 1954-1961, consists of four Kaplan turbines. For each of them, the water with a flow rate of Q = 150 m3/s is supplied with a flow rate of h = 70.5 m at full power. a) What is the total installed pow - Delivers 7184
The pump delivers 0.75 hl of water per minute. How long does it take to fill the tank with a volume of 10m³? Write the result in hours and minutes. - Swimming 6649
How long will the swimming pool be 20 m long, 12 m wide, and 2 m deep? Two inlets are used for filling, each filling nine hectoliters of water per minute.